Tender Details
Particulars | Details |
---|---|
Title |
Missing Cd On Sarahan Chandigarh Road Km 0/0 To 42/00 (Sh P/L Slab On Existing Abutment Rd 40/315 C/O Wing Walls Etc)
|
Description |
Missing Cd On Sarahan Chandigarh Road Km 0/0 To 42/00 (Sh P/L Slab On Existing Abutment Rd 40/315 C/O Wing Walls Etc)
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_101892_1 |
Reference Number |
PW/SRN/CB/-11418-676dated 10.03.2025 |
Tender Fee | 500 |
EMD | 27000 |
Tender Value | |
Place | Sarahan |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=149819 |
Start Date | March 13, 2025 00:20 |
End Date |
22/03/2025 ( Expired 29 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Read morePls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Read moreImprovement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Read moreFdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Fdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Read moreP/l integral cement based water proofing treatment i/c dismantling the existing damaged water proofing treatment and other misc. repair works of mumty room and parapet walls etc., on the terrace of main exchange and str exchange building at nirmal
P/l integral cement based water proofing treatment i/c dismantling the existing damaged water proofing treatment and other misc. repair works of mumty room and parapet walls etc., on the terrace of main exchange and str exchange building at nirmal
Read moreMaintenance of road from dmc kdc road to borai from ch.0.00 km to ch.0.30 km total length 0.30 km under damcherra sub division, pwd r and b during the year 2025 2026 sh metalling, carpeting, seal coating, construction of cd, cd s wing walls,pucc
Maintenance of road from dmc kdc road to borai from ch.0.00 km to ch.0.30 km total length 0.30 km under damcherra sub division, pwd r and b during the year 2025 2026 sh metalling, carpeting, seal coating, construction of cd, cd s wing walls,pucc
Read moreConstructing of slab drain on sh-14 to umarpata daripada road vr -166 at km 0/00 to 1/00 at village umasrpata tal. sakri dist dhule
Constructing of slab drain on sh-14 to umarpata daripada road vr -166 at km 0/00 to 1/00 at village umasrpata tal. sakri dist dhule
Read moreC/o link road from khaltu dhar chebri to tandali km 0/00 to 2/00
C/o link road from khaltu dhar chebri to tandali km 0/00 to 2/00 sh c/o r/wall at rd 0/035 to 0/050 and 0/460 to 0/480
Read moreConstruction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Construction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Read moreC/o bridge on batera to shatal road km 0/0 to 7/0
C/o balance works of both sides wing wall of 10.00 mtr span rcc slab culvert at rd 5/450 under bridge head
Read moreof your Industry type