Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rectification Of Bavali River Removal Of Accumulated Silt Slush And Boulders Due To Land Slide At Poyyamala Upstream And Downstream Side Of Irattathode Bridge In Kelakam Grama Panchayath In Kannur Distict
|
| Description |
Rectification Of Bavali River Desiltation Work
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_679066_1 |
|
Reference Number |
IRR/IA/TR/4065/2024_5_1_1/1 |
| Tender Fee | 1090 |
| EMD | 12360 |
| Tender Value | |
| Place | Near Irattathode Bridge at Poyyamala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1056004 |
| Start Date | July 03, 2024 23:30 |
| End Date |
Expired
08/07/2024
Expired 714 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
General-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
Read moreConstruction of bridge over river kali, approach road and protection work at village jhanda musharrafpur road to saidpur road in district hapur
Construction of bridge over river kali, approach road and protection work at village jhanda musharrafpur road to saidpur road in district hapur
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreEmergency monsoon preparedness rectification of bavali river removal of accumulated silt, slush and boulders deposited due to land slide in between nambudakam junction and neendunokki bridge in kottiyoor grama panchayath in kannur distict
Emergency monsoon preparedness rectification of bavali river removal of accumulated silt, slush and boulders deposited due to land slide in between nambudakam junction and neendunokki bridge in kottiyoor grama panchayath in kannur distict
Read moreMonsoon preparedness 2026 removal of accumulated silt from valiyathodu at upstream and downstream of vandamattom bridge in ward no 8 9 10 of kodikkulam gramapanchayath
Monsoon preparedness 2026 removal of accumulated silt from valiyathodu at upstream and downstream of vandamattom bridge in ward no 8 9 10 of kodikkulam gramapanchayath
Read moreRectification of edayar river removal of accumulated silt and slush deposited due to land slide near pachathuruth in kolayad grama panchayath in kannur district
Rectification of edayar river desiltation work
Read moreMonsoon preparedness 2026 removal of accumulated silt from valiyathodu at upstream and downstream of manakkuzhy checkdam in ward no 1 0 of karimannoor gramapanchayath
Monsoon preparedness 2026 removal of accumulated silt from valiyathodu at upstream and downstream of manakkuzhy checkdam in ward no 1 0 of karimannoor gramapanchayath
Read moreRmf protecting the eroded bank of pamburuthi island in valapattanam river at downstream side of pamburuthi bridge in kolacheri grama panchayath in kannur district general civil work
Rmf protecting the eroded bank of pamburuthi island in valapattanam river at downstream side of pamburuthi bridge in kolacheri grama panchayath in kannur district general civil work
Read moreMonsoon preparedness 2025 clearing the water way of kallar river upstream and downstream of peechad bridge in ward no 1 of pallivasal grama panchayath reach2
Monsoon preparedness 2025 clearing the water way of kallar river upstream and downstream of peechad bridge in ward no 1 of pallivasal grama panchayath reach2
Read moreMonsoon preparedness 2025 clearing the water way of kallar river upstream and downstream of peechad bridge in ward no 1 of pallivasal grama panchayath reach1
Monsoon preparedness 2025 clearing the water way of kallar river upstream and downstream of peechad bridge in ward no 1 of pallivasal grama panchayath reach1
Read moreof your Industry type