🚂 Procurement Opportunity: Smoothing Reactor Cooling Blower With Motor 🔧💧 The Ministry Of Railways, Under The Central Government, Invites Tenders For The Supply Of A Smoothing Reactor Cooling Blower With Motor To Be Installed At Gorakhpur. 📅 Submission Deadline: May 06, 2024, 11:30 Am Tender Fees: Nil Emd: Nil Interested Bidders Are Requested To Refer To The Tender Document For Complete Specifications And Deion Requirements. Bidders Must Ensure Their Proposals Meet The Technical And Financial Criteria Set Forth In The Tender. Keywords: Smoothing Reactor Cooling Blower, Motor, Railway Ministry, Central Government, Tender, Procurement, Gorakhpur| Particulars | Details |
|---|---|
| Title |
Smoothing Reactor Cooling Blower With Moter
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106303279 |
|
Reference Number |
24241139A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Gorakhpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106303279/viewNitPdf_4526749.pdf |
| Start Date | April 02, 2024 18:09 |
| End Date |
Expired
06/05/2024
Expired 872 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreGodavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Read moreHiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreProviding of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Providing of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreProcurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.
Procurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.
Read moreof your Industry type