Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Const. Of 17.5 Mty Chp On Pre Engineered Turnkey Basis For Design,Supply,Erection Commissioning,Trialtesting,Oand M During Dlp For Coal Evacuation(12.5 Mty) From Kg Mines By Pipe/Trough Conveyor Sardega Chp (U/C), Const Of 5 Mty Atls At Kgocp,Ba,Mcl
|
| Description |
Const. Of 17.5 Mty Chp On Pre Engineered Turnkey Basis For Design,Supply,Erection Commissioning,Trialtesting,Oand M During Dlp For Coal Evacuation(12.5 Mty) From Kg Mines By Pipe/Trough Conveyor Sardega Chp (U/C), Const Of 5 Mty Atls At Kgocp,Ba,Mcl
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_MCL_321669_1 |
|
Reference Number |
MCL/Samb/Civil-TC/e-Tender /24-25/12 Dated 21/11/2024 |
| Tender Fee | 0 |
| EMD | 50 Lakh |
| Tender Value | - |
| Place | Kulda OCP under Basundhara Area, MCL, Odisha. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333456 |
| Start Date | December 16, 2024 15:30 |
| End Date |
Expired
03/03/2025
Expired 591 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Const. of 17.5mty chp on preenginered turnkeybasis for design,supply,erection commissioning,trialtesting,oandm during dlp for coalevacuation(12.5 mty) from kgmines by pipe/troughconveyor sardegachp (u/c),const of 5mty atls at kgocp,ba,mcl 2ndcall
Const. of 17.5mty chp on preenginered turnkeybasis for design,supply,erection commissioning,trialtesting,oandm during dlp for coalevacuation(12.5 mty) from kgmines by pipe/troughconveyor sardegachp (u/c),const of 5mty atls at kgocp,ba,mcl 2ndcall
Read moreConst. of 16.5mty chp on preengineered turnkey basis for design,supply,erection, commissioning,trial run,testing,oandm during dlp for coal evacuation 12.5mty from kg mines by pipe/trough conveyor to sardega chp u/c,const. of 4mty atls at kgocp,ba,mcl
Const. of 16.5mty chp on preengineered turnkey basis for design,supply,erection, commissioning,trial run,testing,oandm during dlp for coal evacuation 12.5mty from kg mines by pipe/trough conveyor to sardega chp u/c,const. of 4mty atls at kgocp,ba,mcl
Read morePreengineered turnkey execution for design,supply,erection, commissioning,trial run,testing, o and m during dlp for chp with belt conveyors 40 mty and dispatch through 3 silo with rls at barpali bulb with 4 mty apwtls at integrated kg ocp,ba,mcl(phi)
Preengineered turnkey execution for design,supply,erection, commissioning,trial run,testing, o and m during dlp for chp with belt conveyors 40 mty and dispatch through 3 silo with rls at barpali bulb with 4 mty apwtls at integrated kg ocp,ba,mcl(phi)
Read moreof your Industry type