Tender Details

Particulars Details
Title
Fabrication And Erection Of Different Sizes Of New Pontoons And Repairing Of Old Damaged 60 Drum Pontoons For Installation Of Pumps, Accessories Shifting And Cable Laying Near Pontoon At Different Sumps Of Balram Ocp, Hingula Area For A Period Of 365
Description
Fabrication And Erection Of Different Sizes Of New Pontoons And Repairing Of Old Damaged 60 Drum Pontoons For Installation Of Pumps, Accessories Shifting And Cable Laying Near Pontoon At Different Sumps Of Balram Ocp, Hingula Area For A Period Of 365
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id 2025_MCL_334709_1
Reference
Number
MCL/GM/HA/EnM/ e-Tender/25-26/122 Dt.28.04.25
Tender Fee 0
EMD 77500
Tender Value
Place BALRAM OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346970
Start Date April 30, 2025 15:30
End Date

15/05/2025 ( Expired 28 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine

Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine

Read more
Shifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.

Shifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.

Read more
Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area

Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area

Read more
Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.

Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.

Read more
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Read more
Suplly and erection of 110kv ug cable with accessories to the proposed cmrl gis at alwarthirunagar

Design, detailed engineering, manufacture, supply, laying of cable, erection, final testing and commissioning of 3.6kms of 110kv xlpe al cable for cmrl gis at alwarthirunagar

Read more
Replacing of damaged 2nd drum pontoon of jarlahi patch sump and installation and commissioning of 2nd 4000gpm pump motor on the pontoon and di and erection of its pipe line for fast dewatering of mine water of phularitand, amp colliery.

Replacing of damaged 2nd drum pontoon of jarlahi patch sump and installation and commissioning of 2nd 4000gpm pump motor on the pontoon and di and erection of its pipe line for fast dewatering of mine water of phularitand, amp colliery.

Read more
Day to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days

Day to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days

Read more
Strengthening, reconditioning and repairing of old/ used box type pontoons along with reconditioning of steel drum/barrel type pontoons for installation of pump-motor sets at various locations of mines premises of dipka expansion project.

Strengthening, reconditioning and repairing of old/ used box type pontoons along with reconditioning of steel drum/barrel type pontoons for installation of pump-motor sets at various locations of mines premises of dipka expansion project.

Read more
Fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26

Fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise