Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
S&Amp T Work In Connection With Construction Of Rob At Noi Yard Of Jabalpur Division On West Central Railway (Signalling Work)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77671174 |
|
Reference Number |
JBP-N-SIG-TENDER-2024-29 |
| Tender Fee | 0 |
| EMD | 16800 |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77671174/viewNitPdf_4729296.pdf |
| Start Date | September 28, 2024 00:40 |
| End Date |
Expired
19/10/2024
Expired 725 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annunal maintennace work for 57 nos existing cameras at mandi yard jabalpur dist jabalpur annual rate to be quoted
Annunal maintennace work for 57 nos existing cameras at mandi yard jabalpur dist jabalpur annual rate to be quoted
Read moreAnnunal maintennace work for 20 nos existing cameras at additional fruits and vegetable market yard gram onriya karmeta jabalpur under krishi upaj mandi jabalpur dist jabalpur annual rate to be quoted
Annunal maintennace work for 20 nos existing cameras at additional fruits and vegetable market yard gram onriya karmeta jabalpur under krishi upaj mandi jabalpur dist jabalpur annual rate to be quoted
Read moreGlobal expression of interest eoi for railway signalling and telecommunication business and industrial electronics and automation.
Global expression of interest eoi for railway signalling and telecommunication business and industrial electronics and automation.
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreShifting/re-alignment of lt network at new bridge no.214 at sopore railway yard
Shifting/re-alignment of lt network at new bridge no.214 at sopore railway yard
Read moreElectrification work of rob at crossing 415a/2e, in between naribari-shivrajpur road near sankargarh railway station in distt prayagraj
Electrification work of rob at crossing 415a/2e, in between naribari-shivrajpur road near sankargarh railway station in distt prayagraj
Read moreDesign, drawing, supply, erection, testing and commissioning of balance ohe works at koteganguru yard in connection with development of coaching depot at koteganguru in mysuru division, south western railway, india including modification to existing
As per tender
Read moreHsw-construction of septic tank and water supply connection for toilet in boat yard of marine survey wing office
Constructing a septic tank and connecting it with the existing toilet, also constructing a 3m height gi frame work for carrying a pvc water tank of 750 liter capacity to ensure proper water supply to the toilet
Read moreRob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Read moreSupply, delivery, erection,testing,installation and commissioning including modification of electronic inter-locking (ei) system with signalling and tele-communication (s and t) and other allied works etc. at prayagraj (allahabad)yard .....
..( continue from above ) for connection of rail flyover (phase-ii) with 4th line in connection with construction of rfo-2 under n.c.rly, ministry of raily, govt. of india.
Read moreof your Industry type