Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Requirement Of Electrical Wiring For Light And Fan In Heat Mass Transfer Lab (Med) And Requirement Of Electrical Wiring In New Constructed Computational Lab At Mathematics Dept.
|
| Description |
Requirement Of Electrical Wiring For Light And Fan In Heat Mass Transfer Lab (Med) And Requirement Of Electrical Wiring In New Constructed Computational Lab At Mathematics Dept.
|
| Organisation | Motilal Nehru National Institute of Technology Allahabad | Central Govt. Ministry/Department |
| Tender Id | 2025_MNNIT_871873_1 |
|
Reference Number |
06/ESWM/2025-26 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Academic Campus MNNIT Allahabad Prayagraj |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=916523 |
| Start Date | August 04, 2025 23:30 |
| End Date |
Expired
12/08/2025
Expired 325 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Electrical renovation work in lab no. m. sc-1,2,3,4, computational bio lab and platinum jubilee hall (2nd floor) at zoology department , university of delhi
Electrical renovation work in lab no. m. sc-1,2,3,4, computational bio lab and platinum jubilee hall (2nd floor) at zoology department , university of delhi
Read moreWiring point for light, fan, plug, power etc at panchdev mandir and veer sawarkar park, ward-72, zone-05, kanpur.
Wiring point for light, fan, plug, power etc at panchdev mandir and veer sawarkar park, ward-72, zone-05, kanpur.
Read moreGeafu-46/2026-27 repair/ maintenance/ renewal of point wiring, submain wiring and light fitting fixture and connected items for tech area/otm buildings at af stn udhampur.
Repair/ maintenance/ renewal of point wiring, submain wiring and light fitting fixture and connected items for tech area/otm buildings at af stn udhampur.
Read moreReplacement of damaged electric boards in networking lab(csed), cad lab (med) and computational lab (amd), electrical wiring in new constructed lab in chemical engineering dept., and rewiring in the hod room of mathematics dept., shifting of electric
Replacement of damaged electric boards in networking lab(csed), cad lab (med) and computational lab (amd), electrical wiring in new constructed lab in chemical engineering dept., and rewiring in the hod room of mathematics dept., shifting of electric
Read moreReplacement of damaged electric boards in networking lab(csed), cad lab (med) and computational lab (amd), electrical wiring in new constructed lab in chemical engineering dept., and rewiring in the hod room of mathematics dept., shifting of electric
Replacement of damaged electric boards in networking lab(csed), cad lab (med) and computational lab (amd), electrical wiring in new constructed lab in chemical engineering dept., and rewiring in the hod room of mathematics dept., shifting of electric
Read moreRequirement of electrical wiring in msc. signature lab at chemistry dept.
Requirement of electrical wiring in msc. signature lab at chemistry dept.
Read moreRequirement of electrical wiring for computer systems in 02 nos. lab in design centre and requirement of electrical wiring in new developing lab near hydraulic lab (amd)
Requirement of electrical wiring for computer systems in 02 nos. lab in design centre and requirement of electrical wiring in new developing lab near hydraulic lab (amd)
Read moreRequirement of electrical wiring, internet wiring, shifting of electrical equipments and fire system requirement of electrical wiring, internet wiring, shifting of electrical equipments and fire system for new constructed chamber in dean (r and c)
Requirement of electrical wiring, internet wiring, shifting of electrical equipments and fire system 
 for new constructed chamber in dean (r and c) office.
Read moreRequirement of electrical wiring for new computer systems in simulation lab (eed) and requirement of electrical connections and earthing for fesem instrument in cir lab.
Requirement of electrical wiring for new computer systems in simulation lab (eed) and requirement of electrical connections and earthing for fesem instrument in cir lab.
Read moreRequirement of electrical work in the allotted place near fluid engineering lab (amd), electrical wiring for the new installed tables in basic electronics lab (eced) and requirement of earthing for the equipments in pg lab (chemical engg. dept.)
Requirement of electrical work in the allotted place near fluid engineering lab (amd), electrical wiring for the new installed tables in basic electronics lab (eced) and requirement of earthing for the equipments in pg lab (chemical engg. dept.)
Read moreof your Industry type