Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Invitation For Bids: Metal Fencing Project 🛡️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Invites Bids For The Provision Of W Beam Type Metal Fencing Along The Vm Tpj (Chord Line) Section, Spanning A Total Length Of 28.50 Km Between Talanallur And Ichchangadu Stations. 📅 Bid Submission Deadline: May 13, 2024, 3:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 746300. Bids Should Be Comprehensive, Including Detailed Project Plans, Cost Estimates, And Timelines For Completion. Keywords: Metal Fencing, W Beam, Railway, Infrastructure, Ministry Of Railways, Government Tender, Project Bid, Earnest Money Deposit| Particulars | Details |
|---|---|
| Title |
Provision Of W Beam Type Metal Fencing For A Total Length Of 28.50 Km Between Talanallur And Ichchangadu Stations In Vm Tpj (Chord Line) Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74479289 |
|
Reference Number |
TPJ-06-2024-18 |
| Tender Fee | 0 |
| EMD | 7.46 Lakh |
| Tender Value | |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74479289/viewNitPdf_4527803.pdf |
| Start Date | April 18, 2024 22:31 |
| End Date |
Expired
13/05/2024
Expired 781 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreMaintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreProvision of w-beam type metal fencing for a total length of 22.30 km between puvanur and talanallur stations in villupuram-tiruchchirappalli junction (chord line) section.
For complete deion and other details, please refer to tender
Read moreProvision of w-beam type metal fencing for a total length of 22.20 km between pmb and lli stations in vm-tpj (chord line) section.
For complete deion and other details, please refer to tender
Read moreProvision of w-beam type metal fencing for a total length of 38.70 km between parikkal and ulundurpet stations in vm-tpj (chord line) section.
For complete deion and other details, please refer to tender
Read moreof your Industry type