Tender Details

Particulars Details
Title
Charges For Strengthening The Base Frame Structure And Positioning The Leaning Lt Swgr Rapping Control Panel At Unit Ii Esp Control Room
Description
Charges For Strengthening The Base Frame Structure And Positioning The Leaning Lt Swgr Rapping Control Panel At Unit Ii Esp Control Room
Organisation Government of Tamil Nadu
Tender Id 2023_EB_389136_1
Reference
Number
CE/SE/ES /TTPS /No.131/2023-24
Tender Fee 0
EMD 1000
Tender Value -
Place O/o SE/ES/TTPS
Link
View Original Tender Notice

https://tntenders.gov.in

Start Date November 15, 2023 20:00
End Date
Expired 30/11/2023

Expired 1048 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
S.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system

S.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system

Read more
12 pont 5 mtr high mast pole shaft in two section suitable for 50 per second wind speed as per is 875 part iii base plate 6 holes 445pcd with head frame winch mounting bracket luminaries,32 a control panel,template and anchor plate of 445 of pcd alongwith 6 nos of foundation bolts,single avaiation light fixture,2 by 2 into 4 feet concrete based pillar

12 pont 5 mtr high mast pole shaft in two section suitable for 50 per second wind speed as per is 875 part iii base plate 6 holes 445pcd with head frame winch mounting bracket luminaries,32 a control panel,template and anchor plate of 445 of pcd alongwith 6 nos of foundation bolts,single avaiation light fixture,2 by 2 into 4 feet concrete based pillar

Read more
Ttps es circle em ii strengthening the base frame structure and positioning the leaning lt swgr panel at unit iii esp control room during the overhauling period of 2023 24

Ttps es circle em ii strengthening the base frame structure and positioning the leaning lt swgr panel at unit iii esp control room during the overhauling period of 2023 24

Read more
Overhauling of esp controllers, switchgear, rapping motor, rapping mechanism and heater system control of unit no.13 btps obra.

Overhauling of esp controllers, switchgear, rapping motor,&amp#x0d rapping mechanism and heater system control of unit no.13&amp#x0d btps obra.

Read more
Repairing of critical cracks in live ring roller pads (base and rotate frame), base centre pintail, base chambers and rotate frame structure above rail segment machining pad of 24/96 balram dl working at nigahi project

Repairing of critical cracks in live ring roller pads (base and rotate frame), base centre pintail, base chambers and rotate frame structure above rail segment machining pad of 24/96 balram dl working at nigahi project

Read more
Ttps es circle em ii charges for erection of newly fabricated hinges and renewal of damaged doors in ahp stage i ii ciwph foph i and esp-i ii iii lt swgr panels

Ttps es circle em ii charges for erection of newly fabricated hinges and renewal of damaged doors in ahp stage i ii ciwph foph i and esp-i ii iii lt swgr panels

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise