Tender Details

About Tender

๐Ÿš‚ Invitation For Bids: Upgradation Of New Administrative Building & Fob Construction ๐Ÿญ๐ŸŒ‰ The Ministry Of Railways, Specifically The South Eastern Railway, Invites Bids From Reputable Contractors For The Upgradation Of The New Administrative Building And The Construction Of A Foot Over Bridge (Fob) To Connect The New Administrative Building To The Main Hq Building At Garden Reach, Kolkata. ๐Ÿ“… Bid Submission Deadline: April 4, 2024, 3:00 Pm A Tender Fee Of Inr 417,000 Must Be Submitted With The Earnest Money Deposit (Emd) To Participate. Interested Bidders Should Review The Complete Tender Documents For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Upgradation, New Administrative Building, Fob Construction, South Eastern Railway, Ministry Of Railways, Government Tender, Construction Project, Kolkata
Particulars Details
Title
Upgradation Of New Administrative Building And Construction Of Fob (Foot Over Bridge) Connecting Nab To Main Hq Building Of South Eastern Railway, Garden Reach.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73952682
Reference
Number
T-PUB-GRC-2024-381
Tender Fee 0
EMD 4.17 Lakh
Tender Value
Place Kolkata
Link https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73952682/viewNitPdf_4499896.pdf
Start Date March 06, 2024 18:09
End Date

04/04/2024 ( Expired 453 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction supervision cum design consultancy services for construction of 2 lane major bridge including approaches over brahmaputra between majuli on north bank and jorhat on south bank(job no 715/as/2020-21/213).

Construction supervision cum design consultancy services for construction of 2 lane major bridge including approaches over brahmaputra between majuli on north bank and jorhat on south bank(job no 715/as/2020-21/213).

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Read more
Construction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)

Construction of 4 new foot over bridges in&amp#x0d indore on design, built, operate and transfer&amp#x0d basis and maintenance of existing three fobs&amp#x0d for license period of 10 years (extendable to&amp#x0d five years)

Read more
Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh

Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise