Tender Details

Particulars Details
Title
Tally Pilling At Pond Side Of Moktar Ali Sekh. Sansadiii
Description
Tally Pilling At Pond Side Of Moktar Ali Sekh. Sansadiii
Organisation Zilla Parishad | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 250
EMD 2829
Tender Value
Place KANGANBERIA/III
Link

AAAAAAAAAA

Login to view
Start Date May 28, 2025 00:15
End Date

06/06/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Talegaon industrial area, ph i. widening of existing north and south side roads

Talegaon industrial area, ph i. widening of existing north and south side roads&amp#x0d to four lane road at plot of ms. hyundai at t.i.a. ph i&amp#x0d

Read more
Construction of retaining wall on drain side near garden at shiv sagar in ward no. 79 under zone no. 21

Construction of retaining wall on drain side near garden at shiv sagar in ward no. 79 under zone no. 21

Read more
Construction of buttress wall at the eastern side drain slopes of crushing plant 11b (125 mtr in length) 11b mining, biom kirandul complex

Construction of buttress wall at the eastern side drain slopes of crushing plant 11b (125 mtr in length) 11b mining, biom kirandul complex

Read more
Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha

Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha

Read more
Providing and fixing of wooden packing sleepers at inhaul side of trippler no 2 including grouting and fixing of nuts and bolts at in hauls out haul side of wagon trippler no 2

Providing and fixing of wooden packing sleepers at inhaul side of trippler no.2 including grouting and fixing of nuts and bolts at in hauls out haul side of wagon trippler no 2

Read more
Construction of drain covers for drainage and cc work on road side area at 220kv substation, piran kaliyar.

Construction of drain covers for drainage and cc work on road side area at 220kv substation, piran kaliyar.

Read more
Spl repair to bldg no cb 124 patalpani transit accn incl misc br em wks and spl repair to toilet and rear side of classroom near bayonet school at the inf school mhow under ge mis mhow

Spl repair to bldg no cb 124 patalpani transit accn incl misc br em wks and spl repair to toilet and rear side of classroom near bayonet school at the inf school mhow under ge mis mhow

Read more
Rrs,runway drain, grss cutting to side of runway, repair to south loop dispersal, line marking and painting of runway at af stn gorakhpur

Rrs,runway drain, grss cutting to side of runway, repair to south loop dispersal, line marking and painting of runway at af stn gorakhpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise