Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Monsoon Shed At Compost Depot Of Chandrapur City Municipal
|
Description |
Construction Of Monsoon Shed At Compost Depot Of Chandrapur City Municipal&Amp#X0d
Corporation
|
Organisation | Chandrapur Municipal Corporation | State Govt. and UT |
Tender Id | 2024_CMC_1041160_2 |
Reference Number |
768-12/06/2024 |
Tender Fee | 1220 |
EMD | 98700 |
Tender Value | |
Place | CHANDRAPUR |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1819110 |
Start Date | June 13, 2024 17:30 |
End Date |
21/06/2024 ( Expired 326 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreConstruction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode
Construction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreLining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreof your Industry type