Tender Details
Particulars | Details |
---|---|
Title |
Construction Work Of Two No 2 X 3 M Span Box Culverts In Place Of Damaged Culverts Located At Km 1 And Km 5 Of Aziznagar Nanhu Mundera Atharha Road
|
Description |
Construction Work Of Two No 2 X 3 M Span Box Culverts In Place Of Damaged Culverts Located At Km 1 And Km 5 Of Aziznagar Nanhu Mundera Atharha Road
|
Organisation | Chief Engineer Gorakhpur Zone PWD Gorakhpur UP | State Govt. and UT |
Tender Id | 2025_CEGKP_1006505_1 |
Reference Number |
554/76yat-Deo Circle/25 Dated 01.02.2025 |
Tender Fee | 2950 |
EMD | 5.9 Lakh |
Tender Value | |
Place | Kushinagar |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1803395 |
Start Date | February 15, 2025 23:30 |
End Date |
04/03/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreConstruction of cc road and rcc drain at various locations in ward no 12 municipal council narmadapuram mp.
Construction of cc road and rcc drain at various locations in ward no 12 municipal council narmadapuram mp.
Read moreConstruction of cc road in jaysawaal colony sethi nagar ajay electrical to rajak house girirraj kishor kapoor ward at under zone no. 3
Construction of cc road in jaysawaal colony sethi nagar ajay electrical to rajak house girirraj kishor kapoor ward at under zone no. 3
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreConstruction of cc road and drain from punjab national bank to shri ram house in ward no 7 at nagar panchayat ugu,unnao.
Construction of cc road and drain from punjab national bank to shri ram house in ward no 7 at nagar panchayat ugu,unnao.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreof your Industry type