Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Alert: Psi Maintenance Services For Dnr Division 🛠️ The Ministry Of Railways, Central Government, Invites Bids From Experienced Service Providers For The Outsourcing Of Psi Maintenance Activities For Electrified Sections Over The Dnr Division For A Period Of Two Years. 📅 The Last Date For Bid Submission Is July 2, 2024, At 12:00 Pm. Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 374,300. No Tender Fee Is Payable. Interested Parties Should Review The Complete Tender Document For Detailed Requirements And Submission Guidelines. Keywords: Psi Maintenance, Ministry Of Railways, Electrified Sections, Dnr Division, Outsourcing, Central Government Tender, Earnest Money Deposit| Particulars | Details |
|---|---|
| Title |
Outsourcing Of Psi Maintenance Activities For Electrified Sections Over Dnr Division For Two (2) Years.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75140019 |
|
Reference Number |
TRD-DNR-OT-10-24-25 |
| Tender Fee | 0 |
| EMD | 3.74 Lakh |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75140019/viewNitPdf_4571589.pdf |
| Start Date | June 03, 2024 18:30 |
| End Date |
Expired
02/07/2024
Expired 780 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of ink bottles/maintenance boxes/cartridges on rate contract basis for a period of 3 years. in division no:corp-mp.
Procurement of ink bottles/maintenance boxes/cartridges on rate contract basis for a period of 3 years. in division no:corp-mp.
Read moreProcurement of 350hp submersible pump set complete along with cmc for 5 years after warranty. in division no:corp-mp.
Procurement of 350hp submersible pump set complete along with cmc for 5 years after warranty. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreDesign, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years.(group-02)
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years.(group-02)
Read moreDesign, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreof your Industry type