Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Wbm Road From Newly Construction Road To Weigh Bridge (Near Railway Track Of Raj Ocp) Under Rajnagar Oc Of Hasdeo Area.
|
| Description |
Providing Wbm Road From Newly Construction Road To Weigh Bridge (Near Railway Track Of Raj Ocp) Under Rajnagar Oc Of Hasdeo Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_324421_1 |
|
Reference Number |
GM/HSD/C/e-Tender/24-25/133 Date 28.12.2024 |
| Tender Fee | 0 |
| EMD | 35800 |
| Tender Value | - |
| Place | RAJNAGAR OCP OF HASDEO AREA DISTT.- ANUPPUR (M.P.) |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336288 |
| Start Date | December 31, 2024 15:30 |
| End Date |
Expired
11/01/2025
Expired 643 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Goods transportation service - monthly based service - outside state railway track machines and other track or bridge materials 4 point 5 tonnes capacity trucks
Goods transportation service - monthly based service - outside state railway track machines and other track or bridge materials 4 point 5 tonnes capacity trucks
Read moreDeposit southern railway doubling of railway track utility shifting at kunjalammoodu re alignment of existing sewer main line from chainage 222200 to chainage 222300 and laying of di k9 pipe through the proposed railway over bridge at kunjalammoodu
Deposit southern railway doubling of railway track utility shifting at kunjalammoodu re alignment of existing sewer main line from chainage 222200 to chainage 222300 and laying of di k9 pipe through the proposed railway over bridge at kunjalammoodu
Read moreCleaning, testing and adjusting of ci test weight each of 20 kg for annual verification and stamping of newly installed 140 mt rail in-motion weigh bridge installed at saunda siding under urimari project
Cleaning, testing and adjusting of ci test weight each of 20 kg for annual verification and stamping of newly installed 140 mt rail in-motion weigh bridge installed at saunda siding under urimari project
Read moreJeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read moreConstruction of 4th bg line from itarsi (km 745.130) to bina (km 982.130) including earthwork, tunnels, bridges, road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling & telecommunication works, and allied miscellaneous works in connection with itarsi - bina 4th line project under west central railway in the state of madhya pradesh.
Construction of 4th bg line from itarsi (km 745.130) to bina (km 982.130) including earthwork, tunnels, bridges, road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling & telecommunication works, and allied miscellaneous works in connection with itarsi - bina 4th line project under west central railway in the state of madhya pradesh.
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreConstruction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreConstruction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Construction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Read moreof your Industry type