Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm I Unit Ii Attending To Certain Prive And Breakdown Maintenance Works In Coal Mills, Rc Feeders Hot, Cold And Seal Air System Of Mills For A Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Mpm I Unit Ii Attending To Certain Prive And Breakdown Maintenance Works In Coal Mills, Rc Feeders Hot, Cold And Seal Air System Of Mills For A Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_526055_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.16/25-26 |
Tender Fee | 0 |
EMD | 5400 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=626372 |
Start Date | February 19, 2025 17:30 |
End Date |
04/03/2025 ( Expired 105 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreNctps i se m ii ahp dn unit i ii iii outsourcing of operation and maintenance of pdfac system for a period of 60 days or until completion of quantity (58000 mt) whichever is earlier
Nctps i se m ii ahp dn unit i ii iii outsourcing of operation and maintenance of pdfac system for a period of 60 days or until completion of quantity (58000 mt) whichever is earlier
Read moreManpower
Providing of outsourced personnel for certain works i.e. 12 nos. technical assistants (skilled) for each section to assist om for attending fuse off calls and breakdowns on works contract basis in operation division anakapalli of anakapalli circle for a period of 2 years for the fy 2025-26 and fy 2026-27 i.e. for 01.07.2025 to 30.06.2027(24 months).
Read moreManpower
Providing of outsourced personnel for certain works i.e. (i)15 nos technical assistants (skilled) for each section to assist om for attending fuse off calls and breakdowns on works contract basis in operation division narsipatnam of anakapalli circle for a period of 2 years for the fy 2025-26 and fy 2026-27 i.e. for 01.07.2025 to 31.03.2027(24 months).
Read moreYtps
Tggenco-ytps(5x800mw)-certain prive maintenance, up-keeping and break down works round the clock of hp-1103 bowl mills, mill reject system, gravimetric feeders with dynamic classifier, other connected equipment and pulverized coal pipes of boiler- ii for the fy 2025-26 from 01.04.2025 or actual date of commencement of work to 31.03.2026 with necessary t and p and petty consumables
Read moreNctps i operation circle o and e dn fire fighting unit i ii and iii attending failure defective deluge systems of hvws mvws at c row of outside cable gallery
Nctps i operation circle o and e dn fire fighting unit i ii and iii attending failure defective deluge systems of hvws mvws at c row of outside cable gallery
Read moreNctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se mi circle turbine maintenance division annual maintenance work for the year 25 26 specification no 18 25 26
Nctps i se mi circle amc 25 26 tm dn unit i ii iii attending prive maintenance and breakdown works etc in air compressors for a period from the date of handing over of site to 31 03 2026
Read moreTtps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreTtps operation circle mpm ii unit v overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 5a to 5f during forthcoming overhaul
Ttps operation circle mpm ii unit v overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 5a to 5f during forthcoming overhaul
Read moreof your Industry type