Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair/ Replacement Of Conveyor Belts, Pulley Lagging, Renewal Of Joints By Hot/Cold Vulcanizing At
|
| Description |
Repair/ Replacement Of Conveyor Belts, Pulley Lagging, Renewal Of Joints By Hot/Cold Vulcanizing At Sinter Plant.
|
| Organisation | Steel Authority of India Ltd | Public Sector Undertakings |
| Tender Id | 99979 |
|
Reference Number |
GEM/2024/B/5619819 Dt:- 19.11.2024 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | IISCO Steel Plant |
| Link |
View Original Tender Notice
https://sailtenders.co.in/sail.html |
| Start Date | November 19, 2024 19:00 |
| End Date |
Expired
04/12/2024
Expired 681 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Conveyor pulleys rubber lagging work by cold vulcanizing at chipper house at tnpl unit - ii trichy
Conveyor pulleys rubber lagging work by cold vulcanizing at chipper house at tnpl unit - ii
Read moreEchp-ii-providing rubber lagging of various pulleys in conveyor belts
Echp-ii-providing rubber lagging of various pulleys in conveyor belts
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp,sathupally area for a period of 2 years.
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp,sathupally area for a period of 2 years.
Read more08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
Read moreReplacement of conveyor belts and motor/gear boxes at q10 berth wi
Replacement of conveyor belts and motor/gear boxes at q10 berth wi
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreRepair replacement and improvement to defective parts overhauling of compressor hot and cold water pipeline insulations ahu filters heaters descaling of condensor chiller and their defective accessories certain essential spares and other allied wor
Repair replacement and improvement to defective parts overhauling of compressor hot and cold water pipeline insulations ahu filters heaters descaling of condensor chiller and their defective accessories certain essential spares and other allied wor
Read moreof your Industry type