Tender Details
Particulars | Details |
---|---|
Title |
The Work Of Shifting Of Identified Electric Poles Of 11 Kv Line And L.T. Line Falling Under Widening And Strengthening Of Ait Kotara Road (Other District Road) From Km 1 To Km 14.040 (Population Part) At District Jalaun
|
Description |
The Work Of Shifting Of Identified Electric Poles Of 11 Kv Line And L.T. Line Falling Under Widening And Strengthening Of Ait Kotara Road (Other District Road) From Km 1 To Km 14.040 (Population Part) At District Jalaun
|
Organisation | Chief Engineer Electrical Mechanical PWD Lucknow | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2354 |
EMD | 7.05 Lakh |
Tender Value | |
Place | Jhansi |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 22:15 |
End Date |
16/06/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreBalance work of repair and upgradation of road from jerthan mahadev mandir to abdul sk aftans house under jerthan gram panchayet within egra-i panchayet samity in the district of purba medinipur(length- 2.750 km.)
Balance work of repair and upgradation of road from jerthan mahadev mandir to abdul sk aftans house under jerthan gram panchayet within egra-i panchayet samity in the district of purba medinipur(length- 2.750 km.)
Read moreAAAAAAAAAA
Login to viewMollarpur majipara bolpur road from 18.0 km to 31.3 km, strengthening work including construction of 10 nos. of cd structures under birbhum highway division no. i in the district of&#x0d birbhum.
Read moreWidening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Widening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreAAAAAAAAAA
Login to viewUrgent repair of krishnagar majdia road from 2.00km to 12.00kmp (sh-8) by realising the expenditure from security deposit of the work of krishnagar majdia road (sh-8) from 0.0.0km to 24.66km widening and strengthening work in the district of nad
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreof your Industry type