Tender Details
Particulars | Details |
---|---|
Title |
Providing Protection To Sadarpur Complex Of River Yamuna By Repairing 06 Nos. Old Damaged Stone Studs To Protect Abadi Area After Flood 2024
|
Description |
Providing Protection To Sadarpur Complex Of River Yamuna By Repairing 06 Nos. Old Damaged Stone Studs To Protect Abadi Area After Flood 2024
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_438825_1 |
Reference Number |
2025E260589E ED6B 4071 847C 7756DF69CA97120IRR |
Tender Fee | 16180 |
EMD | 2.96 Lakh |
Tender Value | |
Place | SADARPUR |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=516167 |
Start Date | April 07, 2025 18:40 |
End Date |
15/04/2025 ( Expired 7 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing chain link fencing to protect the proposed plantation (2025-26) from wildlife, enrichment plantation in various of forest areas to enhance biodiversity, density, and quality of the forest area in sukhna wildlife sanctuary by planting native
Providing chain link fencing to protect the proposed plantation (2025-26) from wildlife, enrichment plantation in various of forest areas to enhance biodiversity, density, and quality of the forest area in sukhna wildlife sanctuary by planting native
Read moreClustered project for construction of 02 two nos rcc sluice gate at khushamara gp and jamjuri gp and 01 one no anti erosion work along the left bank of gomati river under udaipur municipal council fdr work to river bank protection by cc block at umc
Clustered project for construction of 02 two nos rcc sluice gate at khushamara gp and jamjuri gp and 01 one no anti erosion work along the left bank of gomati river under udaipur municipal council fdr work to river bank protection by cc block at umc
Read moreProviding protection to badoli complex by constructing 6 no. new stone studs on river yamuna village palra after flood 2024 in district sonipat.
Estimate for providing protection to badoli complex by constructing 6 no. new stone studs on river yamuna village palra after flood 2024 in district sonipat.
Read moreModification of operator cabin air conditioning system of 02 nos. be1800e shovels from hydraulic powered to electrically powered by installing a motor of 415v/3ph/3hp after its rewinding and repair/rewinding of 06 nos. compressor motor 415v/15hp.
Modification of operator cabin air conditioning system of 02 nos. be1800e shovels from hydraulic powered to electrically powered by installing a motor of 415v/3ph/3hp after its rewinding and repair/rewinding of 06 nos. compressor motor 415v/15hp.
Read moreElectrical testing division- mau, for the protection of power transformer due to faults in vcb, control panel etc. from time to time, repairing and repair work is done to protect the above mentioned vcb, control panel etc. from getting damaged.
Electrical testing division- mau, for the protection of power transformer due to faults in vcb, control panel etc. from time to time, repairing and repair work is done to protect the above mentioned vcb, control panel etc. from getting damaged.
Read moreScheme for protection of agriculture land of sh. manmohan khadri by providing 600ft staining in lower somb river near rd 9200 to 9800 right side (revised length 410 feet)
Scheme for protection of agriculture land of sh. manmohan khadri by providing 600ft staining in lower somb river near rd 9200 to 9800 right side (revised length 410 feet)
Read moreWbiw/se/mdc/nit-06(e) of 2024-25
Special repair to 6 nos (s, 1a, 2a, b, c, d type) residential blocks including external painting along with replacement of old electrical wires within sech abasan complex, sector-iii, block-ff, salt lake, ps-bidhannagar (south), dist- north 24 pgs
Read moreFormation of road embankment with gravel from silos to wagon tippler road chp v.stage
Ktps-v vi stages -civil- o m-ii- formation of road embankment with gravel from vth stage silos along the ash pipe lines upto y junction of wagon tippler road in chp area, providing 6mm thick acc sheets in place of damaged sheets for cladding of old crusher house in chp area and providing structural steel staircase to the spf building at main gate for monitoring the aaqms of ktps-v vi.stages.
Read moreConstructing 536 ft three tier steining for the protection of road from bhood to mandlaya at village bhood from river begna after flood 2024
Constructing 536 ft three tier steining for the protection of road from bhood to mandlaya at village bhood from river begna after flood 2024
Read moreConstructing 1744ft (760 ft three tier plus 224 three tier plus 760 double tier) steining for the protection of abadi and agriculture land of village batwal and village raipur rani from river dangri after flood 2024(short terms)
Constructing 1744ft (760 ft three tier plus 224 three tier plus 760 double tier) steining for the protection of abadi and agriculture land of village batwal and village raipur rani from river dangri after flood 2024(short terms)
Read moreof your Industry type