Tender Details
Particulars | Details |
---|---|
Title |
Jjm 2022 23 Pavaratty Regional Water Supply Scheme Phase Iii Rwpm From Thrithala Pumping Station To Mudavannur Wtp And Interconnection Work General Civil Work
|
Description |
Jjm 2022 23 Pavaratty Regional Water Supply Scheme Phase Iii Rwpm From Thrithala Pumping Station To Mudavannur Wtp And Interconnection Work General Civil Work
|
Organisation | Government of Kerala |
Tender Id | 2023_KWA_617056_1 |
Reference Number |
RT-271/SE/PHC/TSR/2023-24 |
Tender Fee | 11800 |
EMD | 2 Lakh |
Tender Value | |
Place | KWA, PH Circle, Thrissur |
Link | https://etenders.kerala.gov.in |
Start Date | October 28, 2023 21:30 |
End Date |
13/11/2023 ( Expired 560 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Chambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDeposit-water supply scheme to poyya panchayath-nagara sanchaya padhathi- construction of intake well cum pump house and laying raw water pumping main -general civil work-1
Deposit-water supply scheme to poyya&#x0d panchayath-nagara sanchaya padhathi-&#x0d construction of intake well cum pump house&#x0d and laying raw water pumping main -general&#x0d civil work-1&#x0d
Read moreLaying of new pipe line for dwara, hilanswali and akhandwali bhilang water supply scheme (including upstream and downstream side) due to construction of song dam of block raipur, district dehradun under deposit work
Laying of new pipe line for dwara, hilanswali and akhandwali bhilang water supply scheme (including upstream and downstream side) due to construction of song dam of block raipur, district dehradun under deposit work
Read moreMonitoring and verification (mv) assessment 2024-25 of lakwa thermal power station in compliance with perform achieve and trade (pat) scheme for the pat cycle vii 2022-23 to 2024-25.
Monitoring and verification (mv) assessment 2024-25 of lakwa thermal power station in compliance with perform achieve and trade (pat) scheme for the pat cycle vii 2022-23 to 2024-25.
Read moreSupply, installation, testing and commissioning of a phase contrast microscope to the department of biotechnology, university of calicut under pm-usha scheme from original equipment manufacturers (oems) or authorized distributors/dealers
Supply, installation, testing and commissioning of a phase contrast microscope to the department of biotechnology, university of calicut under pm-usha scheme from original equipment manufacturers (oems) or authorized distributors/dealers
Read moreExisitng water supply scheme samirowal 1 no. block nurpur bedi district rupnagar tubewell based under head 4215 jjm
Installing new tubewell size of 200 mm id straight tubewell drilling of 500mm 20 of suitable size up to 120 mtr. depth in place of failed tubewell pumping machinery rising main and all other contingent works therefore complete in all respect
Read moreSupply delivery and fixing of flow control valve in house service connections phase ii under dedicated water supply scheme to erode city municipal corporation in erode district under deposit work
Supply delivery and fixing of flow control valve in house service connections phase ii under dedicated water supply scheme to erode city municipal corporation in erode district under deposit work
Read moreRe tender general 2024 25 providing bm and bc to poochackal ulavaip road from ch 1 700 to 3 350 in aroor lac general civil work
Re tender general 2024 25 providing bm and bc to poochackal ulavaip road from ch 1 700 to 3 350 in aroor lac general civil work
Read moreJjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Jjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Read moreM and r to barvi dam and allied works replacement of old ci 150 mm water supply distribution pipeline by 200 mm dia ms pipeline from wtp barvi dam to esr at rest house at barvi dam.
M and r to barvi dam and allied works replacement of old ci 150 mm water supply distribution pipeline by 200 mm dia ms pipeline from wtp barvi dam to esr at rest house at barvi dam.
Read moreof your Industry type