Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services E515 Sea Water Leakage Observed From Port Main Engine Suction Line View P
|
| Description |
|
| Organisation | Department of Defence | Ministry of Defence |
| Tender Id | GEM/2025/B/6030597 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 06, 2025 22:03 |
| End Date |
Expired
27/03/2025
Expired 570 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | ARD | 27-03-2025 15:27:26 | MSE | Qualified |
| 2 | DURGEKAR CONSTRUCTIONS | 27-03-2025 13:48:43 | MSE | Qualified |
| 3 | LAKSHMI NARAYAN MARINE SERVICES | 27-03-2025 13:28:34 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | LAKSHMI NARAYAN MARINE SERVICES( MSE Social Category:General ) | Item Categories : Custom Bid for Services - E515 Sea water leakage observed from port main engine suction line view p | 251000.00 | L1 |
| 2 | DURGEKAR CONSTRUCTIONS( MSE Social Category:General ) | Item Categories : Custom Bid for Services - E515 Sea water leakage observed from port main engine suction line view p | 295000.00 | L2 |
| 3 | ARD( MSE Social Category:OBC ) | Item Categories : Custom Bid for Services - E515 Sea water leakage observed from port main engine suction line view p | 320000.00 | L3 |
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e079 sea water leakage observed from pme exhaust pipeline in water jet compartment leakage area to be welded repaired all inway jobs included ie removal of c..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e079 sea water leakage observed from pme exhaust pipeline in water jet compartment leakage area to be welded repaired all inway jobs included ie removal of c..
Read moreCustom bid for services - repair of cooling device of module 1 view leakage
Custom bid for services - repair of cooling device of module 1 view leakage
Read moreCustom bid for services - repair of cooling device of module 2 view leakage
Custom bid for services - repair of cooling device of module 2 view leakage
Read moreCustom bid for services - clearing and forwarding of ship spares at kolkata airport/ sea port
Custom bid for services - clearing and forwarding of ship spares at kolkata airport/ sea port
Read moreCoalescer cloth,air cleaner (element suction filter compressor and engine),filter element-compressor oil
Coalescer cloth,air cleaner (element suction filter compressor and engine),filter element-compressor oil
Read moreMain engine (port) simplex filter/anode cu 100/250do,anode cu-70/200d0
Main engine (port) simplex filter/anode cu 100/250do,anode cu-70/200d0
Read moreExtension and revamping of sea port passenger terminal hall at haddo wharf, pmb, under sd-iv, svpnd, apwd, sri vijaya puram
Extension and revamping of sea port passenger terminal hall at haddo wharf, pmb, under sd-iv, svpnd, apwd, sri vijaya puram
Read moreDouble panel led x ray illuminator view box,suction machine,defibrillator,medical ecg machine 12 channel with accessories,syringe infusion pump
Double panel led x ray illuminator view box,suction machine,defibrillator,medical ecg machine 12 channel with accessories,syringe infusion pump
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e075 sea water leakage observed from exhaust pipe line of port da between exhaust flap valve and hull penetration area leakage needs to be arrested by weldin..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e076 ac condenser safety valve discharge pipeline to be routed outside of compartment qty02 nos pipeline length 03 mtr all inway jobs included mat copper dia..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e077 01 in no fire hydrant dia 55 mm locking pin deteriorated locking pin to be repaired renewed as per sample service provider,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e078 lub oil leakage observed from sme lo replenishment pump discharge pipeline near sump area pipe dia 20 mm length 35 feet mat ms leakage needs to be arres..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e075 sea water leakage observed from exhaust pipe line of port da between exhaust flap valve and hull penetration area leakage needs to be arrested by weldin..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e076 ac condenser safety valve discharge pipeline to be routed outside of compartment qty02 nos pipeline length 03 mtr all inway jobs included mat copper dia..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e077 01 in no fire hydrant dia 55 mm locking pin deteriorated locking pin to be repaired renewed as per sample service provider,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e078 lub oil leakage observed from sme lo replenishment pump discharge pipeline near sump area pipe dia 20 mm length 35 feet mat ms leakage needs to be arres..
Read morePortable engine driven 37 tph fire pump as per encl for yard,impeller portable eng driven 37 tph fire pump as per encl,pump o ring gasket set for eng driven 37 tph as per encl,mech seal for portable engine driven 37tph pump as per encl,wearing ring for porta eng driven 37tph pump as per encl,strainer for portable engine driven 37tph pump as per encl,3 dia suction hose with end fittings as per encl,engine gasket set for port engine drvn 37tph pp as per encl,fo filter for port engine driven 37 tph pump as per encl,strainer with o ring filter for 37thp pump as per encl,tool kit set for portable 37 tph fire pump as per encl,engine gasket set for portable eng driven pump as per encl,fuel filter for portable engine driven pimp as per encl,fuel injector for port eng driven 37 tph pump as per encl,piston with ring for port engine driven 37tph as per encl,recoil assembly for port engin driven 37tph as per encl,portable submersible pump motor driven 40 tph as per encl,mech.seal for 40tph port md submersible pump as per
Portable engine driven 37 tph fire pump as per encl for yard,impeller portable eng driven 37 tph fire pump as per encl,pump o ring gasket set for eng driven 37 tph as per encl,mech seal for portable engine driven 37tph pump as per encl,wearing ring for porta eng driven 37tph pump as per encl,strainer for portable engine driven 37tph pump as per encl,3 dia suction hose with end fittings as per encl,engine gasket set for port engine drvn 37tph pp as per encl,fo filter for port engine driven 37 tph pump as per encl,strainer with o ring filter for 37thp pump as per encl,tool kit set for portable 37 tph fire pump as per encl,engine gasket set for portable eng driven pump as per encl,fuel filter for portable engine driven pimp as per encl,fuel injector for port eng driven 37 tph pump as per encl,piston with ring for port engine driven 37tph as per encl,recoil assembly for port engin driven 37tph as per encl,portable submersible pump motor driven 40 tph as per encl,mech.seal for 40tph port md submersible pump as per
Read moreof your Industry type