Tender Details

Particulars Details
Title
Retender Rebuild Rki Disinfection Arrangements Supply And Installation Of Dosing Pump With Accessories For Chlorination And Disinfection Arrangements Under Harippad Section
Description
Retender Rebuild Rki Disinfection Arrangements Supply And Installation Of Dosing Pump With Accessories For Chlorination And Disinfection Arrangements Under Harippad Section
Organisation Kerala Water Authority | State Govt. and UT
Tender Id 2025_KWA_745372_1
Reference
Number
WRD/KWA-CE(CR)/RE-TR/8066/2023
Tender Fee 1015
EMD 11496
Tender Value
Place WSP SUBDIVISION HARIPPAD
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1202445
Start Date March 03, 2025 23:30
End Date

17/03/2025 ( Expired 111 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police

Design, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police

Read more
Item wise procurement and supply of printer,computer accessories for a period of 12months

Item wise procurement and supply of printer,computer accessories for a period of 12months

Read more
Request for proposal (rfp) for selection of concessionaire for development of plug and play facilities under ppp mode in 50 acres on dbfot basis with a concession period of 45 years in sipcot panapakkam

Request for proposal (rfp) for selection of&amp#x0d concessionaire for development of plug and&amp#x0d play facilities under ppp mode in 50 acres on&amp#x0d dbfot basis with a concession period of 45 years in&amp#x0d sipcot panapakkam

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Read more
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme

Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme.

Read more
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26

Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26

Read more
Supply installation implementation integration commissioning and maintenance of hw infrastructure and associated sw for upi

Supply installation implementation integration commissioning and maintenance of hw infrastructure and associated sw for upi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise