Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fabrication, Installation And Testing Of Sv 03 K And Sv 04 K And Associated Work Under 24 Inch X 48.38 Km Singasandra Krishnagiri Pipeline Under Kkbmpl Ph Ii Of Gail (India) Limited
|
Description |
Fabrication, Installation And Testing Of Sv 03 K And
Sv 04 K And Associated Work Under 24 Inch X 48.38 Km
Singasandra Krishnagiri Pipeline Under
Kkbmpl Ph Ii Of Gail (India) Limited
|
Organisation | GAIL (India) Limited | Public Sector Undertakings |
Tender Id | 2025_GAIL_226822_1 |
Reference Number |
05/51/23RQ/GAIL/001(i)-16 |
Tender Fee | 0 |
EMD | 1.8 Lakh |
Tender Value | |
Place | Noida |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254656 |
Start Date | February 24, 2025 16:30 |
End Date |
03/03/2025 ( Expired 104 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreFabrication, supply, installation and testing of transmitter racks with transmitters, field instruments and associated ss tubing, cabling and termination for hlw partitioning facility at north bay of wip, kalpakkam
Fabrication, supply, installation and testing of transmitter racks with transmitters, field instruments and associated ss tubing, cabling and termination for hlw partitioning facility at north bay of wip, kalpakkam
Read moreSupply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes
Supply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes
Read moreElectrical rewiring and installation work of narayanpur phc under namkhana block, south 24 parganas.
Electrical rewiring and installation work of narayanpur phc under namkhana block, south 24 parganas.
Read more05/se/c-ii/r b/kmda/ w-28 (part-viii) of 2025-2026 date- 03/06/2025(sl no-04)
Repair and up-gradation work of narshingh dutta road under howrah municipal corporation area.
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreNit no 19 2025-26 shifting and replacing of 350mm ci and 400 mm ac pipeline including testing and commissioning along toshniwal nallah near parbatpura byepass under city division ii ajmer (deposit work)
Nit no 19 2025-26 shifting and replacing of 350mm ci and 400 mm ac pipeline including testing and commissioning along toshniwal nallah near parbatpura byepass under city division ii ajmer (deposit work)
Read moreJjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Jjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Read moreof your Industry type