Tender Details

Particulars Details
Title
Shovel belcha as per is 274 (part 1, part 2 and part 3),axes
Description
Organisation Department of Atomic Energy | PMO
Tender Id GEM/2024/B/4783019
Reference Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
End Date

05/04/2024 ( Expired 7 days ago )

Search Similar tenders?
Similar Tenders
Design manufacture supply installation integration testing and commissioning of rolling stock cbtc telecommunication psd and depot m and p of line 5 phase 1 and phase 2 of mmrda including 15 years of cmc plus 2 years of dlmp

Design manufacture supply installation integration testing and commissioning of rolling stock cbtc telecommunication psd and depot m and p of line 5 phase 1 and phase 2 of mmrda including 15 years of cmc plus 2 years of dlmp

Read more
Design manufacture supply installation integration testing and commissioning of power supply and traction e and m lift and escalators including 15 years of comprehensive maintenance after 2 years of dlmp for part of metro line 5 of mmrda

Design manufacture supply installation integration testing and commissioning of power supply and traction e and m lift and escalators including 15 years of comprehensive maintenance after 2 years of dlmp for part of metro line 5 of mmrda

Read more
Cs for ie for 4/6 laning of marutharoad to edathanattukara section of nh966 from km. 0.000 to km.61.440 (design length 61.279 km) (civil package 1 n 2) in kerala in ham mode under bharatmala pariyojana.

Cs for ie for 4/6 laning of marutharoad to edathanattukara section of nh966 from km. 0.000 to km.61.440 (design length 61.279 km) (civil package 1 n 2) in kerala in ham mode under bharatmala pariyojana.

Read more
Side stopper for wag-7 loco as per clw drg. no. 06/3/15/47 alt-2 or latest

For complete deion and other details, please refer to tender

Read more
Balance work of widening to 2 lane with geometric improvement from km 60.00 to km. 64.825 (actual chainage as per site km. 59.700 to km. 64.525 on nh-507 in the state of uttarakhand under epc mode in nh(o) the year 2023-24

Balance work of widening to 2 lane with geometric improvement from km 60.00 to km. 64.825 (actual chainage as per site km. 59.700 to km. 64.525 on nh-507 in the state of uttarakhand under epc mode in nh(o) the year 2023-24

Read more

No attachments found

Get customized tender Recommendations for your Enterprise