Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Work Of Zigzag Interlocking Road From Composting Boundary Wall To Main Gate Dharam Kote Inside Tdp Plant Of Municipal Council, Netua.
|
| Description |
Construction Work Of Zigzag Interlocking Road From Composting Boundary Wall To Main Gate Dharam Kote Inside Tdp Plant Of Municipal Council, Netua.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_DOLBU_861356_5 |
|
Reference Number |
1063/NPP/15 VA VITT/NIRMAN/2023-24 DATE-08-11-2023 |
| Tender Fee | 2653 |
| EMD | 2.25 Lakh |
| Tender Value | |
| Place | NAGAR PALIKA PARISHAD GANGAGHAT UNNAO |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 10, 2023 20:30 |
| End Date |
Expired
11/12/2023
Expired 937 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of h. p. drain from vijay sakhre to shailendra sakhre to buddha vihar in vinoba bhave ward in the municipal council area.
Construction of h. p. drain from vijay sakhre to shailendra sakhre to buddha vihar in vinoba bhave ward in the municipal council area.
Read moreConstruction of nallah from mangal murti plaza to main road. 2509
Construction of nallah from mangal murti plaza to main road. 2509
Read moreConstruction of interlocking road from kashmir ji house to shyamveer singh ji house at vill. -kharit, block- jasrana distt. firozabad.
Construction of interlocking road from kashmir ji house to shyamveer singh ji house at vill. -kharit, block- jasrana distt. firozabad.
Read moreProvn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Provn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreConstruction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreof your Industry type