Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Materials For Construction Of Post Harvesting Structure Including Pucca Storage With Thrashing Floor At Alamarathadi Kalam At Nallambal Village Panchayat In Thirunallar Commune
|
Description |
Supply Of Materials For Construction Of Post Harvesting Structure Including Pucca Storage With Thrashing Floor At Alamarathadi Kalam At Nallambal Village Panchayat In Thirunallar Commune
|
Organisation | District Rural Development Agency | State Govt. and UT |
Tender Id | 2025_DRDA_17887_1 |
Reference Number |
F-32/BDO/EC/KKL/2024-25/JE4/1 |
Tender Fee | 525 |
EMD | 34423 |
Tender Value | |
Place | Thirunallar Commune |
Link | https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18233 |
Start Date | March 07, 2025 22:30 |
End Date |
17/03/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.
Construction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.&#x0d &#x0d
Read moreConstruction with 10 years operation and maintenance services of 24x7 drink from tap water supply scheme for golaghat town in assam
Construction with 10 years operation and maintenance services of 24x7 drink from tap water supply scheme for golaghat town in assam
Read moreConstruction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Construction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreDesign, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance
Design, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreLining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreConstruction of rcc bridge rob with steel composite girder and allied works across chengalthodu at puliyampilly nedumbassery in kerala for cial
Construction of rcc bridge rob with steel composite girder and allied works across chengalthodu at puliyampilly nedumbassery in kerala for cial
Read moreof your Industry type