Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Automatic Power Transfer Switches
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/5237085 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 02, 2024 22:22 |
| End Date |
Expired
23/08/2024
Expired 761 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | NETCOM INFOTECH PRIVATE LIMITED | Make : APC Model : APC (AP4423/A ) AUTOMATIC POWER TRANSFER SWITCHES Title : AUTOMATIC POWER TRANSFER SWITCHES | 02-09-2024 17:22:45 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | NETCOM INFOTECH PRIVATE LIMITED | Item Categories : AUTOMATIC POWER TRANSFER SWITCHES | 468055.00 | L1 |
Repair of damaged rotor field pole body of 150mw generators of nagjhari power house
Repair/re-conditioning of rotor field pole body/pole shoe of 150mw generators of nagjhari power house including loading, unloading, transportation etc., covering all associated works required for successful completion of the work
Read moreTggenco-generation-procurement of 2500mt sulphuric acid(technical grade as per is:266-2024) for various thermal power stations of tggenco
Tggenco-generation-procurement of 2500mt sulphuric acid(technical grade as per is:266-2024) for various thermal power stations of tggenco
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreDesign, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreHitachi make automatic transfer switches
Hitachi make automatic transfer switches/ as per tender
Read moreVertiv make automatic transfer switches
Vertiv make automatic transfer switches/ as per tender
Read moreof your Industry type