Tender Details
Particulars | Details |
---|---|
Title |
Ee(e/M)/ Faws I/ T 20 Of 2023 24
|
Description |
Supplying And Fitting Of Additional Pvc Column Pipes At Different P/Hs And Supplying Laying Of Al Armoured Cable At Different P/Hs Of Different Length As Required Under Jhorehat And Duila Faws Scheme.
|
Organisation | Government of West Bengal |
Tender Id | 2023_KMDA_600205_1 |
Reference Number |
EE(E/M)/FAWS-1/2W - 08/ 23 - 24/64 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | Online |
Link | https://wbtenders.gov.in |
Start Date | November 17, 2023 19:30 |
End Date |
24/11/2023 ( Expired 544 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying, laying, testing and commissioning of optical fiber cable, lt power armoured cable, replacement of street or pathway light fixtures, and repairing of speed radar systems at indian institute of technology gandhinagar.
Supplying, laying, testing and commissioning of optical fiber cable, lt power armoured cable, replacement of street or pathway light fixtures, and repairing of speed radar systems at indian institute of technology gandhinagar.
Read moreWater supply scheme for camps at pangong. installation of solar submersible pump chain link fencing laying and fitting of 75mm and 90mm hdpe and pp-r pipe line at maan pangong under sdp
Water supply scheme for camps at pangong. installation of solar submersible pump chain link fencing laying and fitting of 75mm and 90mm hdpe and pp-r pipe line at maan pangong under sdp
Read moreWbnkda/02/ ee-p and gv /nkda of 2025-26 supplying and erection of signage board (200 nos) at different location of parking zone under nkda area in new town kolkata.
Supplying and erection of signage board (200 nos) at different location of parking zone under nkda area in new town kolkata.
Read moreExtraction/dismantling of pvc xlpe cable from different places of yard trench and laying same in trench for feeding power to newly installed capacitor bank with apfc panel at madhuban d.g sub-station under block-ii area
Extraction/dismantling of pvc xlpe cable from different places of yard trench and laying same in trench for feeding power to newly installed capacitor bank with apfc panel at madhuban d.g sub-station under block-ii area
Read moreRepairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of dg/service van and cutting for delivery ranges of pump installed at bkb old sump and quarry 2 under ask oc
Repairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of dg/service van and cutting for delivery ranges of pump installed at bkb old sump and quarry 2 under ask oc
Read moreLaying of 80 mm dia.pvc pipe(supplying ,fitting and fixing) for installation of function street tap at mahua bagan hazrapara within ward 02 under dmc
Laying of 80 mm dia.pvc pipe(supplying ,fitting and fixing) for installation of function street tap at mahua bagan hazrapara within ward 02 under dmc
Read moreWbphed/ee/md/niet_09 of 2025-2026, sl. no. 08
Additional laying of pipe line for improvement of fhtc functionality by different dia upvc pipe providing fhtc forsankail piped water supply scheme at gazole block in the district of malda under malda division, p.h.e. dte.
Read moreDismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Read moreConstruction of 3 (three) unit additional classrooms and 1 unit library room on the first floor at baralutma hs school under durga chowmuhani block of dhalai district under pm shri scheme for the year 2023-24
Construction of 3 (three) unit additional classrooms and 1 unit library room on the first floor at baralutma hs school under durga chowmuhani block of dhalai district under pm shri scheme for the year 2023-24
Read moreShifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreof your Industry type