Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cleanliness Work In The Mandis And Cleanliness And Maintenance Of Toilets Falling Under Market Committees Hisar For The Period 01.08.2025 To 31.07.2026.
|
Description |
Cleanliness Work In The Mandis And Cleanliness And Maintenance Of Toilets Falling Under Market Committees Hisar For The Period 01.08.2025 To 31.07.2026.
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2025_HBC_456108_1 |
Reference Number |
SMC_HSR_2025 |
Tender Fee | 3180 |
EMD | 57120 |
Tender Value | |
Place | NGM Hisar |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=533801 |
Start Date | July 03, 2025 22:30 |
End Date |
11/07/2025 ( Expired 4 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Read moreSupply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.
Supply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.
Read moreImplementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Read moreRequest for pre-qualification (rfq) - 2025 for the maintenance works to be taken up on risk and cost of the concessionaire/contractor-2nd list.
Request for pre-qualification (rfq) - 2025 for the maintenance works to be taken up on risk and cost of the concessionaire/contractor-2nd list.
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreSupply of threat containment vessel (tcv) at various aai airports
Supply of threat containment vessel (tcv) at various aai airports in india with 03
 years onsite warranty with spares and consumables and provision of inhouse/ call
 basis maintenance for 03 years after completion of warranty period.
Read morePerformance based maint contracts esti of initial rectification wk, routine maint wk and periodic maint wks bet km 1.957 to km 65.0 design length 56.618 km km 133.020 to km 137.330 design length 4.316 km chinyal
Pbmc estimate bet km 1.957 to km 65.00, km 133.020 to km 137.330 on rishikesh dharasu road and km 110.860 to km 123.080 on gangotri dharasu road on nh 34 in uttarakhand state (total length 73.192 km) for 5 year maintenance period
Read moreRehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Read moreof your Industry type