Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
B7 D1 Y42541 Connector Tube Male (1/2" X1/2" Npt) Swagelok Make,B7 D1 Y42541 Connector Tube Male 1/2"
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 17, 2025 14:10 |
End Date |
27/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreSupply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Supply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Read moreHiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Read moreFor disposal of house mig (3bhk) and hig (4bhk) house of rahul nagar part 1 phse 2 project under pradhan mantri awas yojana
For disposal of house mig (3bhk) and hig (4bhk) house of rahul nagar part 1 phse 2 project under pradhan mantri awas yojana
Read moreItem 1,item 2,item 3,item 4,item 5,item 6,item 7,item 8,item 9,item 10,item 11,item 12,item 13,item
Read more
Electric wiring at type 1 type 2 type 3 and type 4 house at different departmental colonies at lucknow
Electric wiring at type 1 type 2 type 3 and type 4 house at different departmental colonies at lucknow
Read moreSling 8mm x 2.5meter single wire rope s*,sling 1/2" x 2meter single wire rope so,single wire rope s
Read more
Construction of g plus 2 storied linac building and proposed horizontal and vertical extension up to (g plus 9) with provision of 10 storied of linac building (g plus 2) at 1 harish mukherjee road at ipgmer - sskm hospital, kolkata - sitc of lift
Construction of g plus 2 storied linac building and proposed horizontal and vertical extension up to (g plus&#x0d 9) with provision of 10 storied of linac building (g plus 2) at 1 harish mukherjee road at ipgmer - sskm&#x0d hospital, kolkata - sitc of lift
Read moreWork contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month
Work contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month
Read moreof your Industry type