Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Development Of Open Space With Cricket Turf, Compound Wall (Chainlink Fencing ), Volleyball Ground And Rcc Work For Youth Situated At Mauli Nagar, In Prabhag No. 2,
|
Description |
Development Of Open Space With Cricket Turf, Compound Wall (Chainlink Fencing ), Volleyball Ground And Rcc Work For Youth Situated At Mauli Nagar, In Prabhag No. 2 ,Sonpeth Dist. Parbhani
|
Organisation | Directorate Of Municipal Administration | State Govt. and UT |
Tender Id | 2024_DMA_1078212_1 |
Reference Number |
E-Tender Notice No. 05 of 2024-25 |
Tender Fee | 5500 |
EMD | 1.86 Lakh |
Tender Value | |
Place | M.C.Sonpeth |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1881638 |
Start Date | August 30, 2024 20:35 |
End Date |
06/09/2024 ( Expired 304 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreUnder infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Read moreConstruction of rcc circular tank 2.72 lakhs litres with pump house alongwith 15hp pump at new pahargaon, satellite quarter at prothrapur in ward no.20, birsha nagar ward no. 18, birjgunj in ward no.22, mahaveer nagar tank compound, bird.........
Construction of rcc circular tank 2.72 lakhs litres with pump house alongwith 15hp pump at new pahargaon, satellite quarter at prothrapur in ward no.20, birsha nagar ward no. 18, birjgunj in ward no.22, mahaveer nagar tank compound, bird.........
Read moreExpression of interest for leasing out of space for nursery with restricted time slot/ access including maintainance of horticulture work (by the lessee) of bsnl in bsnl admin and staff quarters compound juhu tara road mumbai 54
Expression of interest for leasing out of space for nursery with restricted time slot/ access including maintainance of horticulture work (by the lessee) of bsnl in bsnl admin and staff quarters compound juhu tara road mumbai 54
Read moreInstallation of permeable paver blocks around the pond, artistic painting in compound wall and providing rain water harvesting at sristy nagar dhobi diggi, ward no.04
Installation of permeable paver blocks around the pond, artistic painting in compound wall and providing rain water harvesting at sristy nagar dhobi diggi, ward no.04
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Read moreConstruction of flower sheds (labor work ) in plot no 2 and civil work for charging station (labor work ) at jalochi subyard for apmc baramati, dist-pune
Construction of flower sheds (labor work ) in plot no 2 and civil work for charging station (labor work ) at jalochi subyard for apmc baramati, dist-pune
Read moreWork of providing tractor trolley driver with 2 workers for door to door garbage collection in ward no. 01 to 65 and tractor trolley driver for cleaning nandishala and drain
Work of providing tractor trolley driver with 2 workers for door to door garbage collection in ward no. 01 to 65 and tractor trolley driver for cleaning nandishala and drain
Read moreRestoration of open well with de-sillting and providing retaining wall,grill cover,painting and fixing of hdpe tank,monoblock pumps in division no-47,48,48,51,52,53,54,56,57, 60 at kondalampatty ward office.
Restoration of open well with de-sillting and providing retaining wall,grill cover,painting and fixing of hdpe tank,monoblock pumps in division no-47,48,48,51,52,53,54,56,57,60 at kondalampatty ward office.
Read moreof your Industry type