Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Work Of 05 Seater Pink Toilet In The Bus Stand Premises.
|
| Description |
Construction Work Of 05 Seater Pink Toilet In The Bus Stand Premises.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_DOLBU_861628_2 |
|
Reference Number |
7/PWD/2023-24 |
| Tender Fee | 1473 |
| EMD | 99794 |
| Tender Value | |
| Place | Nagar Nigam Firozabad |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 14, 2023 14:30 |
| End Date |
Expired
22/11/2023
Expired 975 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreProvision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction work of 05 seater pink toilet in shastri market.
Construction work of 05 seater pink toilet in shastri market.
Read moreConstruction work of 05 seater pink toilet near club chauraha.
Construction work of 05 seater pink toilet near club chauraha.
Read moreConstruction work of 05 seater pink toilet at salai intersection.
Construction work of 05 seater pink toilet at salai chauraha.
Read moreof your Industry type