Tender Details

Particulars Details
Title
M And L For Taking Down Existing Unserviceable Bollard By Breaking Pcc Foundation Complete All As D
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2023/B/3618287
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date July 10, 2023 23:29
End Date
Expired 20/07/2023

Expired 1183 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 KIRAN COMPUTERS - 22-07-2023 18:53:00 MSE Disqualified
2 RUDHRAKSH TRADING CO - 22-07-2023 18:30:56 MSE Qualified
3 SAGARIKA ENTERPRISES - 22-07-2023 14:40:53 MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 SAGARIKA ENTERPRISES(MSE)( MSE Social Category:OBC ) Item Categories : M and L for taking down existing unserviceable Bollard by breaking PCC foundation complete all as d 129228.00 L1
2 RUDHRAKSH TRADING CO (MSE)( MSE Social Category:General ) Item Categories : M and L for taking down existing unserviceable Bollard by breaking PCC foundation complete all as d 133320.00 L2
Similar Tenders
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla

Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla

Read more
Taking down of chowkats or frames not exc 1.5 sqm each with shuttersspecified as directed,supply and fixing factory made upvc door frame overall dimension 48x40 mm with wall thickness 2.0 mm m.s. tube of size 19 x 19 mm as specified as directed,providing and fixing factory made upvc with wall thickness of 23mm 02mm as specified as directed,m and l sheet glass 4.8 mm thick ordinary quality and glazing exc 0.50 sqm as specified as directed,taking down steel tubing having bore of pipe 25 to 32 mm as specified as directed,taking down steel tubing having bore of pipe 20 mm and as specified as directed,s and f for 25 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings in trenches completeas specified as directed,supply and fixing for 20 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings on walls or ceiling or all as specified and directed,supply and fixing in repair 18kw steam generator residential steam ers 310 400 cubic feet as specified as directed,supply and fixing in repair 30 kw steam generator p

Taking down of chowkats or frames not exc 1.5 sqm each with shuttersspecified as directed,supply and fixing factory made upvc door frame overall dimension 48x40 mm with wall thickness 2.0 mm m.s. tube of size 19 x 19 mm as specified as directed,providing and fixing factory made upvc with wall thickness of 23mm 02mm as specified as directed,m and l sheet glass 4.8 mm thick ordinary quality and glazing exc 0.50 sqm as specified as directed,taking down steel tubing having bore of pipe 25 to 32 mm as specified as directed,taking down steel tubing having bore of pipe 20 mm and as specified as directed,s and f for 25 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings in trenches completeas specified as directed,supply and fixing for 20 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings on walls or ceiling or all as specified and directed,supply and fixing in repair 18kw steam generator residential steam ers 310 400 cubic feet as specified as directed,supply and fixing in repair 30 kw steam generator p

Read more
Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span

Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise