Tender Details
Particulars | Details |
---|---|
Title |
Painting Of Fish Shaped Aquarium,Ticket Counter,Compound Wall,Replacing Existing Water Tank And Interior Work At Malampuzha
|
Description |
Painting Of Fish Shaped Aquarium,Ticket Counter,Compound Wall,Replacing Existing Water Tank And Interior Work At Malampuzha
|
Organisation | Harbour Engineering Department | State Govt. and UT |
Tender Id | 2024_HED_661847_1 |
Reference Number |
HED/CEHED/TR/692/2023_5_1_1/1 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | MALAMPUZHA - PALAKKAD |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1025663 |
Start Date | February 23, 2024 23:30 |
End Date |
02/03/2024 ( Expired 463 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreWork of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Work of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read morePainting work with acrylic smooth exterior paint and with cement based water soluble exterior paint i.e snowecem on non -residential building in bsl colony at bbmb sundernagar.
Painting work with acrylic smooth exterior paint and with cement based water soluble exterior paint i.e snowecem on non -residential building in bsl colony at bbmb sundernagar.
Read moreConstruction of 02 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nabaghunti kirtan math zone-39 asansol under amrut 2.0 phase-iii within amc
Construction of 02 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at nabaghunti kirtan math zone-39 asansol&#x0d under amrut 2.0 phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreDesigning, installation, commissioning and operation of 105 kld stp and 55 kld etp at kpd (including removal of existing plant) asreplacement work.
Designing, installation, commissioning and operation of 105 kld stp and 55 kld etp at kpd (including removal of existing plant) asreplacement work.
Read moreArm of residential and non residential building at bhq bop and tc uttarakashi of 35th mahidanda uttarakashi for the year 2025 26 sh distempering painting and other work at bhq
Arm of residential and non residential building at bhq bop and tc uttarakashi of 35th mahidanda uttarakashi for the year 2025 26 sh distempering painting and other work at bhq
Read moreof your Industry type