Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pupilometer,Cmc For First Year,Cmc For Second Year,Cmc For Third Year,Cmc For Fourth Year,Cmc For F
|
| Description |
|
| Organisation | Department of Health and Family Welfare | Ministry of Health and Family Welfare |
| Tender Id | GEM/2025/B/5819089 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 17, 2025 22:55 |
| End Date |
Expired
07/02/2025
Expired 614 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreTender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read morePms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Pms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreHigh end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
Read moreIn ward-96, ashok nagar b-block, interlocking tiles around the park in front of b-36, b-39a and 127/1 and on the side track of the park from vaishno mandir to third-f-80 on rakesh marg and road improvement work by danes from third-f-46 to third-f-57
In ward-96, ashok nagar b-block, interlocking tiles around the park in front of b-36, b-39a and 127/1 and on the side track of the park from vaishno mandir to third-f-80 on rakesh marg and road improvement work by danes from third-f-46 to third-f-57
Read moreHp color laserjet managed multifunction printer (mfp),camc-warranty- first year,camc-warranty- second year,camc-warranty- thrid year
Hp color laserjet managed multifunction printer (mfp),camc-warranty- first year,camc-warranty- second year,camc-warranty- thrid year
Read moreSupply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Read moreof your Industry type