Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of Damaged Stone Pitching Area At Downstream Of Barrage Site Of 3x42 Mw Larji Hep
|
| Description |
Reconstruction Of Damaged Stone Pitching Area At Downstream Of Barrage Site Of 3x42 Mw Larji Hep
|
| Organisation | HPSEBL | State Govt. and UT |
| Tender Id | 2024_HPSEB_90482_1 |
|
Reference Number |
2024-25-017 |
| Tender Fee | 590 |
| EMD | 10881 |
| Tender Value | - |
| Place | THALOUT |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=133896 |
| Start Date | July 12, 2024 14:30 |
| End Date |
Expired
18/07/2024
Expired 822 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreAr mo civil works of barrage components of 3x42 mw larji hep
Carrying out the job of manual cleaning and sweeping of control room, power intake, site offices, ct gate gallery, side drains etc. at barrage site of larji hep
Read moreRestoration of floating log boom by repair of damaged chain link pvc drum float boom installed in larji reservoir in front of power intake at barrage site of 3x42 mw larji hep
Restoration of floating log boom by repair of damaged chain link pvc drum float boom installed in larji reservoir in front of power intake at barrage site of 3x42 mw larji hep
Read moreSupply and installation of sma, seismic monitoring system and dam level/displacement monitoring system for instrumentation at barrage site of 3x42 mw larji hep, distt. mandi h.p.
Supply and installation of sma, seismic monitoring system and dam level/displacement monitoring system for instrumentation at barrage site of 3x42 mw larji hep, distt. mandi h.p. under sr. executive engineer, arb.and mtc division, hpsebl thalout.
Read moreRm of trcm at barrage site of larji hep for the year 2023 24
Carrying out the job of manual cleaning and upkeeping of trash rack cleaning machine including round the clock operation of trcm for removal of trash debris from the intake at barrage site of larji hep under sr executive engineer arb and mtc div
Read moreEarly warning system for larji hep 126 mw
Tender for supply installation testing commissioning of early flood warning system efws for larji hydro electric project 126 mw in distt mandi himachal pradesh
Read moreConstruction of temporary protection wall with stone masonry at main access tunnel of underground larji power house from flooding during the upcoming monsoon season for the year 2024-25 of 3x42 mw larji hep
Construction of temporary protection wall with stone masonry at main access tunnel of underground larji power house from flooding during the upcoming monsoon season for the year 2024-25 of 3x42 mw larji hep
Read moreTender for providing and laying micro concrete and high-performance concrete in scoured glacis block along with fixing of rails and anchors, welded wire mesh etc. in downstream glacis of radial gate no. 5 of barrage of 3x42 mw larji hep
Providing and laying micro concrete and high-performance concrete in scoured glacis block along with fixing of rails and anchors, welded wire mesh etc. in downstream glacis of radial gate no. 5 of barrage of 3x42 mw larji hep
Read more1 no. dehydration plant 5000 lph capacity and 1no. portable transformer oil storage tank of 20kl capacity for 3x42 mw larji hep
Supply erection testing and commissioning of 1 no. dehydration plant 5000 lph capacity and 1no. portable transformer oil storage tank of 20kl capacity for 3x42 mw larji hep thalout distt. mandi hp
Read moreConstruction of temporary protection wall with stone masonry at construction adit/ emergency exit tunnel of underground larji power house from flooding during the upcoming monsoon season for the year 2024-25 of 3x42 mw larji hep
Construction of temporary protection wall with stone masonry at construction adit/ emergency exit tunnel of underground larji power house from flooding during the upcoming monsoon season for the year 2024-25 of 3x42 mw larji hep
Read moreof your Industry type