Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ahp Dn Unit Ii Attending Breakdown Works In Bottom Ash Hopper Scrapper Feeder Clinker Grinders For A Period Of Six Months
|
| Description |
Ahp Dn Unit Ii Attending Breakdown Works In Bottom Ash Hopper Scrapper Feeder Clinker Grinders For A Period Of Six Months
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_471199_1 |
|
Reference Number |
CE/NCTPSI/SE/MII/SpN41/2024-25 |
| Tender Fee | 0 |
| EMD | 30800 |
| Tender Value | - |
| Place | work |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=559807 |
| Start Date | August 08, 2024 22:30 |
| End Date |
Expired
21/08/2024
Expired 787 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreProcurement of excen crusher assembly and its spares and different spares for bottom ash hopper for unit 5 oh under ahp mm
Procurement of excen crusher assembly and its spares and different spares for bottom ash hopper for unit 5 oh under ahp mm
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreTggenco btps stage ii- cam division-reconditioning of clinker grinder rollers, roller shafts, shaft sleeves, shaft sleeve housings, fabrication of wear and guide plates, lantern rings of unit-4 bottom ash hopper clinker grinder assemblies during the overhaul for the year 2026-27
Tggenco btps stage ii- cam division-reconditioning of clinker grinder rollers, roller shafts, shaft sleeves, shaft sleeve housings, fabrication of wear and guide plates, lantern rings of unit-4 bottom ash hopper clinker grinder assemblies during the overhaul for the year 2026-27
Read moreProcurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreNctps i se m ii circle ahp dn breakdown routine maintenance of recovery water lines no 2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period of one year from the date of taken over of site
Nctps i se m ii circle ahp dn breakdown routine maintenance of recovery water lines no 2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period of one year from the date of taken over of site
Read moreAhp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders
Ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders
Read moreAhp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders for a period of six months
Ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders for a period of six months
Read moreof your Industry type