Tender Details

About Tender

🚂 Procurement Opportunity: Elevation Of Platforms For Aden/Tirunelveli Section 🛤️ The Ministry Of Railways, Central Government, Invites Bids For The Proposed Elevation Of Existing Low Level Platforms To High Level Platforms On The Aden/Tirunelveli Section. The Project Spans Several Stations Including Palayamkottai, Alwar Thirunagari, Kachchnavilai, Kurumbur, Kayalpattinam, And Platforms No. 1 & 2 At Seydunganallur. 📅 Bid Submission Deadline: May 31, 2024, 2:00 Pm A Tender Fee Of Inr 430300 Must Be Submitted With The Earnest Money Deposit (Emd) To Participate In The Bidding Process. Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Ministry Of Railways, Platform Elevation, Infrastructure Development, Government Tender, Aden/Tirunelveli Section, Railway Stations, Emd, Tender Submission
Particulars Details
Title
Aden/Tirunelveli Section : Proposed Raising Of Existing Low Level Platform No 1 To High Level Platform At Palayamkottai,Alwar Thirunagari, Kachchnavilai, Kurumbur, Kayalpattinam And Platform No 1&Amp2 At Seydunganallur Stations
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74910982
Reference
Number
MDU-W-08-2024-03
Tender Fee 0
EMD 4.3 Lakh
Tender Value
Place Chennai
Link https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74910982/viewNitPdf_4556539.pdf
Start Date May 08, 2024 23:51
End Date

31/05/2024 ( Expired 379 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Modification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower...

Modification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower ...

Read more
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Read more
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Read more
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Periodical services to boundary wall and compound wall of x area including necessary repair at 54 asp under ge (af) gurgoan no 1

Periodical services to boundary wall and compound wall of x area including necessary repair at 54 asp under ge (af) gurgoan no 1

Read more
Balance work in construction of rob in lieu of level crossing no. 449 at gwalior-dholpur section at the risk and cost of previous agency

Balance work in construction of rob in lieu of level crossing no. 449 at km 1262/02-04 on gwalior-dholpur section at the risk and cost of previous agency

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise