Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Third Harmonics Lcm Kit
|
| Description |
Procurement Of Third Harmonics Lcm Kit
|
| Organisation | Jhabua Power Ltd | Public Sector Undertakings |
| Tender Id | 2024_JPL_213370_1 |
|
Reference Number |
JPL/CnM/24-25/1100012163 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | JPL, Seoni |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=235229 |
| Start Date | November 04, 2024 21:30 |
| End Date |
Expired
25/11/2024
Expired 686 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Selection of third party auditor (tpa) for virtual court project
Selection of third party auditor (tpa) for virtual court project
Read moreConstruction of third floor over the existing g+2 floors court building at medak district. sub work :providing air conditioning
Construction of third floor over the existing g+2 floors court building at medak district. sub work :providing air conditioning
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreIdentification tally,tape adhesive,paper abrasive waterproof,pd 680,lcm 207,lcm 216,lcm 302,lcm 403
Read more
Harmonics filter at cdc,associated accessories at cdc,installation at cdc,harmonics filter at idc,m
Read more
Procurement of harmonics and flicker generator
Procurement of harmonics and flicker generator
Read moreof your Industry type