Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐๏ธ Bharat Coking Coal Limited (Bccl) Rfp: Pump Motor Shifting Services ๐ญ๐ง Bharat Coking Coal Limited (Bccl), A Public Sector Undertaking, Is Seeking Bids For The Specialized Service Of Shifting A 4000 Gpm Pump Motor Five Times, Both Before And After Blasting Operations At The Jarlahi Coal Face, Including The Di Of Its Pipeline, At Phularitand Under Amp Colliery. ๐๏ธ๐ง ๐ Bid Submission Deadline: May 08, 2024, 6:00 Pm ๐ต Emd: Inr 33,000 Interested Service Providers Must Demonstrate Their Capability To Handle Such Operations With Precision And Safety, Adhering To The Project Timelines And Compliance With All Safety Regulations. Keywords: Bharat Coking Coal Limited, Pump Motor Shifting, Blasting Operations, Coal Face, Amp Colliery, Rfp, Public Sector Undertaking, Safety Measures, Engineering Services| Particulars | Details |
|---|---|
| Title |
Shifting Of 4000 Gpm Pump Motor (Five Times) Of Ground Level After And Before Blasting At Jarlahi Coal Face And Di Of Its Pipe Line Due To Safety Purpose At Phularitand Under Amp Colliery.
|
| Description |
Shifting Of 4000 Gpm Pump Motor (Five Times) Of 
Ground Level After And Before Blasting At Jarlahi Coal Face 
And Di Of Its Pipe Line Due To Safety Purpose At 
Phularitand Under Amp Colliery.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_307136_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/74 |
| Tender Fee | 0 |
| EMD | 3300 |
| Tender Value | |
| Place | AMP COLLIERY BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318265 |
| Start Date | April 27, 2024 17:30 |
| End Date |
Expired
08/05/2024
Expired 778 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 4000gpm pump motor (two times) of ground level after and before blasting at jarlahi coal face and di of its pipe line due to safety purpose at phularitand under amp colliery
Shifting of 4000gpm pump motor (two times) of 
 ground level after and before blasting at jarlahi coal 
 face and di of its pipe line due to safety purpose 
 at phularitand under amp colliery
Read moreShifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with di of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with 
 di of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreShifting of 2nd 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with di of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 2nd 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with 
 di of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreShifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreLowering of 4000gpm pump motor of ground level due to decreasing of water level at jarlahi coal face along with di of its pipe line at phularitand under amp colliery.
Lowering of 4000gpm pump motor of ground level due to decreasing of water level at jarlahi coal face along with di of its pipe line at phularitand under amp colliery.
Read moreMarching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.
Marching of 2nd 4000gpm pump motor (three times) 
 of jarlahi sump along with di of its pipe line due 
 to mining activity at phularitand, amp colliery.
Read moreMarching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.
Marching of 2nd 4000gpm pump motor (three times) 
 of jarlahi sump along with di of its pipe line due 
 to mining activity at phularitand, amp colliery.
Read moreFour times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery
Four times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe 
 line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery
Read moreShifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual 
 decreasing of water level at muraidih under amp colliery
Read moreDi of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.
Di of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.
Read moreof your Industry type