Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐๏ธ Bharat Coking Coal Limited (Bccl) Rfp: Pump Motor Shifting Services ๐ญ๐ง Bharat Coking Coal Limited (Bccl), A Public Sector Undertaking, Is Seeking Bids For The Specialized Service Of Shifting A 4000 Gpm Pump Motor Five Times, Both Before And After Blasting Operations At The Jarlahi Coal Face, Including The Di Of Its Pipeline, At Phularitand Under Amp Colliery. ๐๏ธ๐ง ๐ Bid Submission Deadline: May 08, 2024, 6:00 Pm ๐ต Emd: Inr 33,000 Interested Service Providers Must Demonstrate Their Capability To Handle Such Operations With Precision And Safety, Adhering To The Project Timelines And Compliance With All Safety Regulations. Keywords: Bharat Coking Coal Limited, Pump Motor Shifting, Blasting Operations, Coal Face, Amp Colliery, Rfp, Public Sector Undertaking, Safety Measures, Engineering Services| Particulars | Details |
|---|---|
| Title |
Shifting Of 4000 Gpm Pump Motor (Five Times) Of Ground Level After And Before Blasting At Jarlahi Coal Face And Di Of Its Pipe Line Due To Safety Purpose At Phularitand Under Amp Colliery.
|
| Description |
Shifting Of 4000 Gpm Pump Motor (Five Times) Of 
Ground Level After And Before Blasting At Jarlahi Coal Face 
And Di Of Its Pipe Line Due To Safety Purpose At 
Phularitand Under Amp Colliery.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_307136_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/74 |
| Tender Fee | 0 |
| EMD | 3300 |
| Tender Value | - |
| Place | AMP COLLIERY BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318265 |
| Start Date | April 27, 2024 17:30 |
| End Date |
Expired
08/05/2024
Expired 843 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 4000gpm pump motor (two times) of ground level after and before blasting at jarlahi coal face and di of its pipe line due to safety purpose at phularitand under amp colliery
Shifting of 4000gpm pump motor (two times) of 
 ground level after and before blasting at jarlahi coal 
 face and di of its pipe line due to safety purpose 
 at phularitand under amp colliery
Read moreShifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with di of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with 
 di of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreShifting of 2nd 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with di of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 2nd 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with 
 di of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreShifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreMarching of 1st pontoon with 4000gpm pump motor (five times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Marching of 1st pontoon with 4000gpm pump motor (five times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Read moreMarching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.
Marching of 2nd 4000gpm pump motor (three times) 
 of jarlahi sump along with di of its pipe line due 
 to mining activity at phularitand, amp colliery.
Read moreMarching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.
Marching of 2nd 4000gpm pump motor (three times) 
 of jarlahi sump along with di of its pipe line due 
 to mining activity at phularitand, amp colliery.
Read moreLowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Lowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Read moreMarching of 3rd pontoon with 4000gpm pump motor (four times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Marching of 3rd pontoon with 4000gpm pump motor (four times) from existing position to the another lower 
 side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Read moreReplacing of b/d 4000gpm pump with a 2000gpm pump of jarlahi coal face sump and di of its pipeline (due to mining activity) for fast dewatering of mine water of jarlahi sump of phularitand, amp colliery.
Replacing of b/d 4000gpm pump with a 2000gpm pump 
 of jarlahi coal face sump and di of its pipeline 
 (due to mining activity) for fast dewatering of mine 
 water of jarlahi sump of phularitand, amp colliery.
Read moreof your Industry type