Tender Details

About Tender

๐Ÿ—๏ธ Bharat Coking Coal Limited (Bccl) Rfp: Pump Motor Shifting Services ๐Ÿญ๐Ÿšง Bharat Coking Coal Limited (Bccl), A Public Sector Undertaking, Is Seeking Bids For The Specialized Service Of Shifting A 4000 Gpm Pump Motor Five Times, Both Before And After Blasting Operations At The Jarlahi Coal Face, Including The Di Of Its Pipeline, At Phularitand Under Amp Colliery. ๐Ÿ—๏ธ๐Ÿ’ง ๐Ÿ“… Bid Submission Deadline: May 08, 2024, 6:00 Pm ๐Ÿ’ต Emd: Inr 33,000 Interested Service Providers Must Demonstrate Their Capability To Handle Such Operations With Precision And Safety, Adhering To The Project Timelines And Compliance With All Safety Regulations. Keywords: Bharat Coking Coal Limited, Pump Motor Shifting, Blasting Operations, Coal Face, Amp Colliery, Rfp, Public Sector Undertaking, Safety Measures, Engineering Services
Particulars Details
Title
Shifting Of 4000 Gpm Pump Motor (Five Times) Of Ground Level After And Before Blasting At Jarlahi Coal Face And Di Of Its Pipe Line Due To Safety Purpose At Phularitand Under Amp Colliery.
Description
Shifting Of 4000 Gpm Pump Motor (Five Times) Of &#X0d Ground Level After And Before Blasting At Jarlahi Coal Face &#X0d And Di Of Its Pipe Line Due To Safety Purpose At &#X0d Phularitand Under Amp Colliery.&#X0d
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_307136_1
Reference
Number
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/74
Tender Fee 0
EMD 3300
Tender Value
Place AMP COLLIERY BARORA AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318265

Start Date April 27, 2024 17:30
End Date
Expired 08/05/2024

Expired 778 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Shifting of 4000gpm pump motor (two times) of ground level after and before blasting at jarlahi coal face and di of its pipe line due to safety purpose at phularitand under amp colliery

Shifting of 4000gpm pump motor (two times) of &#x0d ground level after and before blasting at jarlahi coal &#x0d face and di of its pipe line due to safety purpose &#x0d at phularitand under amp colliery

Read more
Shifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with di of its pipe line due to safety purpose at phularitand under amp colliery.

Shifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with &#x0d di of its pipe line due to safety purpose at phularitand under amp colliery.

Read more
Shifting of 2nd 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with di of its pipe line due to safety purpose at phularitand under amp colliery.

Shifting of 2nd 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with &#x0d di of its pipe line due to safety purpose at phularitand under amp colliery.

Read more
Shifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.

Shifting of 4000gpm pump motor set (four times) after and before extraction of coal from the floor of jarlahi coal face and diversion of its pipe line due to safety purpose at phularitand under amp colliery.

Read more
Lowering of 4000gpm pump motor of ground level due to decreasing of water level at jarlahi coal face along with di of its pipe line at phularitand under amp colliery.

Lowering of 4000gpm pump motor of ground level due to decreasing of water level at jarlahi coal face along with di of its pipe line at phularitand under amp colliery.

Read more
Marching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.

Marching of 2nd 4000gpm pump motor (three times) &#x0d of jarlahi sump along with di of its pipe line due &#x0d to mining activity at phularitand, amp colliery.

Read more
Marching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.

Marching of 2nd 4000gpm pump motor (three times) &#x0d of jarlahi sump along with di of its pipe line due &#x0d to mining activity at phularitand, amp colliery.

Read more
Four times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery

Four times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe &#x0d line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery

Read more
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery

Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual &#x0d decreasing of water level at muraidih under amp colliery

Read more
Di of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.

Di of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise