Tender Details
Particulars | Details |
---|---|
Title |
Repair Rewinding Of 3 Phase 11 0.433 Kv 250 Kva Oil Immersed Distribution Transformer Installed At Bsf Campus Dhanakgre Of 200 Bn Bsf Under Shq Bsf Shillong
|
Description |
Repair Rewinding Of 3 Phase 11 0.433 Kv 250 Kva Oil Immersed Distribution Transformer Installed At Bsf Campus Dhanakgre Of 200 Bn Bsf Under Shq Bsf Shillong
|
Organisation | DG,BSF,MHA | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 11778 |
Tender Value | |
Place | Dhanakgre campus 200 BN BSF |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 16:00 |
End Date |
13/05/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer 3 phase 50 hz vector group-dyn11 at clear water pumping plant jamadoba and different transformers at dfifferent locations under jmada dhanbad
Complete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer 3 phase 50 hz vector group-dyn11 at clear water pumping plant jamadoba and different transformers at dfifferent locations under jmada dhanbad
Read moreRepair maintenance and cleaning of water supply line at bsf campus gokulnagar under shq bsf gknr
Repair maintenance and cleaning of water supply line at bsf campus gokulnagar under shq bsf gknr
Read moreC o 28 men jawan barrack double story at bop nadhankhol of 141 bn bsf now 43 bn bsf under shq bsf shillong
C o 28 men jawan barrack double story at bop nadhankhol of 141 bn bsf now 43 bn bsf under shq bsf shillong
Read moreConstruction 01 nos surveillance cum op shelter g1 and 01 nos surveillance cum op shelter g 2 at bop rajai in aor of 193 bn bsf under shq bsf shillong sh. pvdg iei, fans and service connection and off grid solar plant
Construction 01 nos surveillance cum op shelter g1 and 01 nos surveillance cum op shelter g 2 at bop rajai in aor of 193 bn bsf under shq bsf shillong sh. pvdg iei, fans and service connection and off grid solar plant
Read moreRepairing of 100 kva dg set, srl no. 1308041003333 make cotton greaves sets installed at bop paharmura of 104 bn bsf under shq bsf teliamura.
Repairing of 100 kva dg set, srl no. 1308041003333 make cotton greaves sets installed at bop paharmura of 104 bn bsf under shq bsf teliamura.
Read moreComplete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Complete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Read moreRate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iiijammu during the fin yr 2025-26 or till next tender is finalized.
Rate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iii jammu during the fin yr 2025-26 or till next tender is finalized.
Read moreRewinding/repair of (1) transformer 500 kva 11kv/433v 3-phasesl.no-800112 make-transgeit enterprises 7 (2) neutral earth reactor transformer 25/501 amp 3810-190 volt under ashok ocp piparwar area..
Rewinding/repair of (1) transformer 500 kva 11kv/433v 3-phasesl.no-800112 make-transgeit enterprises 7 (2) neutral earth reactor transformer 25/501 amp 3810-190 volt under ashok ocp piparwar area.
Read moreFor the work of replacement of old and damaged lt bushing rod including oil seal/gaskets etc. (250 to 1000 kva transformer) under 11 kv and lt line- north, meerut.
For the work of replacement of old and damaged lt bushing rod including oil seal/gaskets etc. (250 to 1000 kva transformer) under 11 kv and lt line- north, meerut.
Read moreRepair and maintenance of ac and dc capacitor for 04 nos 30 kva online ups installed at adm block of bsf campus patgaon under ftr hq bsf guwahati.
Repair and maintenance of ac and dc capacitor for 04 nos 30 kva online ups installed at adm block of bsf campus patgaon under ftr hq bsf guwahati.
Read moreof your Industry type