Tender Details

Particulars Details
Title
Provision For Repairs To Bridges In Sln Utr (Ex.) Section Under Aden Sln I In The Jurisdiction Of Sr. Den Iv Lko.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78467388
Reference
Number
20-SrDEN-IV-LKO-2024-25
Tender Fee 0
EMD 60000
Tender Value
Place New Delhi
Link https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78467388/viewNitPdf_4773710.pdf
Start Date November 14, 2024 22:57
End Date

09/12/2024 ( Expired 134 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Read more
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Read more
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Read more
Periodical maintenance and repair of ei in the type i to type iv quarters including the kunjaban ps fire service building and state disaster management building at capital complex agartala for the year 2025 26

Periodical maintenance and repair of ei in the type i to type iv quarters including the kunjaban ps fire service building and state disaster management building at capital complex agartala for the year 2025 26

Read more
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Read more
Repairs/cleaning/laying to sewage lines, manholes, septic tanks and lift well cleaning etc in pocket 1, 2, 3, 4 and purkazi area under age b/r-i of ge roorkee

Repairs/cleaning/laying to sewage lines, manholes, septic tanks and lift well cleaning etc in pocket 1, 2, 3, 4 and purkazi area under age b/r-i of ge roorkee

Read more
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise