Tender Details
About Tender
🏭 Cleaning Services Bid For Dipka Expansion Project 🚜🏗️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Service Providers For The Cleaning Of Spillage Coal And Clearing Of Grizzley Mechanisms During The Unloading Of Tippers At The Truck Receiving Stations (Trs 1 And 2) Of The New Chp, As Well As Other Designated Areas At The Dipka Expansion Project. 📆 Bid Submission Deadline: May 11, 2024, 5:00 Pm The Contract Will Be Awarded For A Period Of 365 Days. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 73,400. Proposals Should Detail The Methodology, Equipment, And Expertise For Efficient And Safe Execution Of The Cleaning And Clearing Operations, In Compliance With Environmental And Safety Regulations. Keywords: Cleaning Services, Coal Spillage, Grizzley Clearing, South Eastern Coalfields Limited, Public Sector Undertaking, Dipka Expansion Project, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Cleaning Of Spillage Coal And Clearing Of Grizzley During Unloading Of Tippers At Hoppers Of Truck Receiving Station Trs 1 And 2 Of New Chp And Other Places By Mechanical Means For A Period Of 365 Days At Dipka Expansion Project.
|
Description |
Cleaning Of Spillage Coal And Clearing Of Grizzley During Unloading Of Tippers At Hoppers Of Truck Receiving Station Trs 1 And 2 Of New Chp And Other Places By Mechanical Means For A Period Of 365 Days At Dipka Expansion Project.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_306893_1 |
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/24-25/12 dtd-22/04/24 |
Tender Fee | 0 |
EMD | 73400 |
Tender Value | |
Place | Dipka Expansion Project, Dipka Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318043 |
Start Date | April 25, 2024 15:30 |
End Date |
11/05/2024 ( Expired 366 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning of spillage coal from belts and chutes and stacking the coal for a period of 02 years under chp cpp, piparwar area.
Cleaning of spillage coal from belts and chutes and stacking the coal for a period of 02 years under chp cpp, piparwar area.
Read moreUnloading of coal from rail wagons in chp by mechanical and manual means.
Unloading of coal from rail wagons in chp by mechanical and manual means.
Read moreAssistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Assistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Read moreCleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreEchp-i- upkeepment of sch-i by clearing of spillage coal in various floors, greasing, topping up of gear box oil, renewal of idlers in belt feeders , shuttle feeders,cleaning of all equipments and all floors sweeping work in crusher at sch-i
Echp-i- upkeepment of sch-i by clearing of spillage coal in various floors, greasing, topping up of gear box oil, renewal of idlers in belt feeders , shuttle feeders,cleaning of all equipments and all floors sweeping work in crusher at sch-i
Read moreCleaning of ground water recharge pond by manual and mechanical means different places of urjanagar colony under rajmahal area.
Cleaning of ground water recharge pond by manual and mechanical means different places of urjanagar colony under rajmahal area.
Read moreExcavation by mechanical means at urdhan ocm, nehariya ugm and dhanaksa ugm as and when required basis for a period of 365 days under pench area.
Excavation by mechanical means at
 urdhan ocm, nehariya ugm and dhanaksa ugm as and when required basis for a period of 365 days under pench area.
Read moreof your Industry type