Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road From Kharuni To Khairiyan Via Chaplah, Garli, Deehar, Makdi And Chamboa Sub Head Formation Cutting, Retaining Walls, C.D. Works , Gsb, Wmm, Tarring Work, Side Drain, C.C. Pavement And Parapets, Road Fureniture, P.F Logo Board, Km
|
Description |
Construction Of Road From Kharuni To Khairiyan Via Chaplah, Garli, Deehar, Makdi And Chamboa Sub Head Formation Cutting, Retaining Walls, C.D. Works , Gsb, Wmm, Tarring Work, Side Drain, C.C. Pavement And Parapets, Road Fureniture, P.F Logo Board, Km
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_95966_1 |
Reference Number |
Construction of road from Kharuni to Khairiyan via Chaplah, Garli, Deehar, Makdi and Chamboa Sub Hea |
Tender Fee | 5000 |
EMD | 5.69 Lakh |
Tender Value | |
Place | Bangana |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=140954 |
Start Date | December 02, 2024 15:30 |
End Date |
12/12/2024 ( Expired 130 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mt on shaheed sudesh marg from subathu to village chapla gp shadyana road in km. 0/00 to 4/525
Mt on shaheed sudesh marg from subathu to village chapla gp shadyana road in km. 0/00 to 4/525.(sh removal of formation deficiency, retainning structures, pl cross drainage works, p/l gsb, wmm, tarring, v shape side drain, c/o parapets, road sign boa
Read moreUpgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp
Upgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp
Read moreRestoration of rain damages on guler nandpur barial road km 0/0 to 8/200
Improvement, passing place, r/wall, cross drainage work, gsb, wmm, tarring work, cement concrete pavement, road side drain and parapets in km 0/0 to 2/750 and 3/350 to 3/600
Read moreConstruction of chandpur to dhagwani via chhabhar kwali dalehra road km. 0/00 to 3/450
Rofd, r/wall, b/wall, cross drainage, p/l gsb, wmm, metal tarring, cement concrete pavement, side drain , parapets sign boards in km. 0/00 to 3/450) under nabard xxx
Read moreConstruction of balance work of churi to bakkal road road km 0/000 to 8/000 (package no hp-02-344) under pmgsy (batch-ii, 2018-19) in distt chamba (h.p.)
Formation cutting, passing places, cross drainage, side drain, parapets, cc pavement, tarring work and road signs etcetra including routine maintenance for five year)
Read moreUp-gradation of haripur to sakri ghera road km 34/00 to 39/180
Formation cutting, c/o 4.00mtr. span slab culvert, r/wall, c.d. work, gsb, wmm, tarring work, cement concrete pavement, road side drain in km 34/00 to 39/180
Read moreC.o and m.t of link road banne di hatti to ghewat behad road from km 0.0to 4.520 sub head balance work of c.o r.wall cross drainges work gsb wmm m.t and u shape drain and crash barriers etc at various rds under nabard ridf-xxvii
C.o and m.t of link road banne di hatti to ghewat behad road from km 0.0to 4.520 sub head balance work of c.o r.wall cross drainges work gsb wmm m.t and u shape drain and crash barriers etc at various rds under nabard ridf-xxvii
Read moreC.o nand m.t link road raipur to bhakhawa via mallan di pind km 0.0 to 3.800 sub head balance work c.o r.wall cross draings work road side pcc drain and parapets etc in km 0.0 to 3.800 under nabard ridf-xxviii
C.o nand m.t link road raipur to bhakhawa via mallan di pind km 0.0 to 3.800 sub head balance work c.o r.wall cross draings work road side pcc drain and parapets etc in km 0.0 to 3.800 under nabard ridf-xxviii
Read moreImprovement and strengthening of kimmughat to chakki ka mod road in km 0/00 to 16/380
Improvement and strengthening of kimmughat to chakki ka mod road in km 0/00 to 16/380(sh removal of formation deficiency retainning structures pl cross drainage works, pl gsb wmm, tarring road side drain, co parapets sign boards and road safety work
Read moreJob 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in
Job 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in
Read moreof your Industry type