Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Gates/Parker/Dunloop/Trelleborg/Polyhose Mak Heavy Duty Rubber Air Hoses And Hydraulic Hoses For Unit 9 And 10 Boiler Pressure Parts
|
Description |
Supply Of Gates/Parker/Dunloop/Trelleborg/Polyhose Mak Heavy Duty Rubber Air Hoses And Hydraulic Hoses For Unit 9 And 10 Boiler Pressure Parts
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 594676 |
Reference Number |
47/25-26/BM-V/P31/CE/OM/KTPS-VVI Stages |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | May 08, 2025 00:30 |
End Date |
21/05/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreProcurement of 300 nb and 250 nb cast basalt lined pipe line for installation in pressure conveying line of ash handling plant of unit no.10 and 11, stps sarni.
Procurement of 300 nb and 250 nb cast basalt lined pipe line for installation in pressure conveying line of ash handling plant of unit no. 10 and 11, stps sarni.
Read moreAnnual maintenance contract (mechanical) of boiler, turbine with their auxiliaries for tpp and unit 9.
Annual maintenance contract (mechanical) of boiler, turbine with their auxiliaries for tpp and unit 9.
Read moreSupply of safety valve and emrv spares for unit-xi boiler
Supply of safety valve and emrv spares for unit-xi boiler
Read moreSupply of ceramic lined pulverized coal bends for unit-9 and 10
Supply of ceramic lined pulverized coal bends for unit-9 and 10
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreDesign supply dismantling erection testing and commissioning of constant load hangers type 2610 divided 167 or its equivalent for unit i boiler
Design supply dismantling erection testing and commissioning of constant load hangers type 2610 divided 167 or its equivalent for unit i boiler
Read moreof your Industry type