Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Tender Announcement: Ttps Mech Ii Ahp Ash Slurry Disposal Lines Scrapping And Cleaning 🚧 Tneb Limited, A State Government Undertaking, Invites Tenders For The Scrapping And Removal Of Ash Slag, As Well As The Cleaning Of Ash Slurry Disposal Lines At Ttps, Specifically Under The 350 Nb Ash Slurry Disposal Pipe Lines At The Dyke Area Between Chainage 850 To 1150 Meters. 📅 Bid Submission Deadline: July 19, 2024, 2:00 Pm Tender Security Amount: Inr 4800 Interested Bidders Are Required To Submit Detailed Proposals, Including Methodology, Equipment, Manpower, And Timelines For The Completion Of The Project. The Work Involves The Removal Of Ash Slag And Cleaning Of All Ash Slurry Disposal Lines To Ensure Operational Efficiency And Safety. Keywords: Tneb Limited, Ttps, Ash Slurry Disposal Lines, Scrapping, Ash Slag Removal, Pipe Cleaning, State Government And Ut, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Ttps Mech Ii Ahp Ash Slurry Disposal Lines Unit Iv V Scrapping Removal Of Ash Slag Under The 350 Nb Ash Slurry Disposal Pipe Lines At Dyke Area Near Chainage 850 1150 Mtr And Cleaning Of Pipes In All Ash Slurry Disposal Lines
|
Description |
Ttps Mech Ii Ahp Ash Slurry Disposal Lines Unit Iv V Scrapping Removal Of Ash Slag Under The 350 Nb Ash Slurry Disposal Pipe Lines At Dyke Area Near Chainage 850 1150 Mtr And Cleaning Of Pipes In All Ash Slurry Disposal Lines
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459970_1 |
Reference Number |
CE/TTPS/SE/M-II/No.320/2024-25 |
Tender Fee | 0 |
EMD | 4800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546765 |
Start Date | July 04, 2024 19:30 |
End Date |
19/07/2024 ( Expired 346 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii ahp erection of 200 nb ss316 gr sch 80 seamless pipes along with fittings of unit iii seal water lines taken from stage iii filtered over head tank
Ttps mech ii ahp erection of 200 nb ss316 gr sch 80 seamless pipes along with fittings of unit iii seal water lines taken from stage iii filtered over head tank
Read moreTtps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Ttps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Read moreTtps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Ttps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreSupply of 350 nb seamless pipe astm a106 gr b with suitable ms coupling for ash slurry disposal lines of unit iv
Supply of 350 nb seamless pipe astm a106 gr b with suitable ms coupling for ash slurry disposal lines of unit iv
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Read moreof your Industry type