Tender Details
Particulars | Details |
---|---|
Title |
Nctps I Es Circle Em Ii Dn Sm S Dn Camp Foc Carrying Out Time Bound Maintenance Works Of Camp Foc For A Period Of 360 Days By Engaging Works Contract At Nctps I
|
Description |
Nctps I Es Circle Em Ii Dn Sm S Dn Camp Foc Carrying Out Time Bound Maintenance Works Of Camp Foc For A Period Of 360 Days By Engaging Works Contract At Nctps I
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_517451_1 |
Reference Number |
CE/NCTPS-I/SE/ES/WC-42/2024-25 |
Tender Fee | 0 |
EMD | 28900 |
Tender Value | |
Place | NCTPS-I |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=615735 |
Start Date | January 08, 2025 23:40 |
End Date |
22/01/2025 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreNctps ii 2 x 600 mw operation circle chemical division time bound works operational and testing assistance to coal lab and quality checking of various chemicals for a period of 308 days from 28 05 2025 to 31 03 2026
Nctps ii 2 x 600 mw operation circle chemical division time bound works operational &#x0d and testing assistance to coal lab and quality checking of various chemicals for a period of 308 &#x0d days from 28 05 2025 to 31 03 2026&#x0d
Read moreNctps i se m ii circle ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 2nd row
Nctps i se m ii circle ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 2nd row
Read moreNctps i operation circle o and e division fire fighting carrying out periodical prive maintenance works in fire protection pumps sluice valves of hydrant and hvws system for a period of one year from the date of handing over of site
Nctps i operation circle o and e division fire fighting carrying out periodical prive maintenance works in fire protection pumps sluice valves of hydrant and hvws system for a period of one year from the date of handing over of site
Read moreNctps i es circle em i dn s dn i replacement of 6 nos defective 245 kv sf6 breaker pole assembly 3 nos existing 245kv capacitor voltage transformer (cvt) 3 nos existing 245kv current transformer (ct) 3 nos isolators 24nos existing las in 230 k
Nctps i es circle em i dn s dn i replacement of 6 nos defective 245 kv sf6 breaker pole assembly 3 nos existing 245kv capacitor voltage transformer (cvt) 3 nos existing 245kv current transformer (ct) 3 nos isolators 24nos existing las in 230 k
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i ii iii outsourcing of operation and maintenance of pdfac system for a period of 60 days or until completion of quantity (58000 mt) whichever is earlier
Nctps i se m ii ahp dn unit i ii iii outsourcing of operation and maintenance of pdfac system for a period of 60 days or until completion of quantity (58000 mt) whichever is earlier
Read moreWbso engg-capex rate contract category-ii works rs. 0 to 50.0 lacs for carrying out - civil, mechanical, electrical works under all dos of west bengal state office 3 yrs with a provision for extension by another six months with mutual consent
Wbso engg-capex rate contract category-ii works rs. 0 to 50.0 lacs for carrying out - civil, mechanical, electrical works under all dos of west bengal state office 3 yrs with a provision for extension by another six months with mutual consent
Read moreNctps ii m i circle mpm ac plant carrying out prive breakdown maintenance works in condenser
Nctps ii m i circle mpm ac plant carrying out prive breakdown maintenance works in condenser
Read moreof your Industry type