Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Of Malda Manikchak Ratua Samsi Road (From 1.50 Kmp To 30.00 Kmp And 35.00 Kmp To 45.30 Kmp) Under Pwd, Malda Division In The District Of Malda, West Bengal Balance Work.
|
Description |
Widening And Strengthening Of Malda Manikchak Ratua Samsi Road (From 1.50 Kmp To 30.00 Kmp And 35.00 Kmp To 45.30 Kmp) Under Pwd, Malda Division In The District Of Malda, West Bengal Balance Work.
|
Organisation | Government of West Bengal |
Tender Id | 2023_WBPWD_548670_1 |
Reference Number |
WBPWD/EEMD/NC/NIT_06/2023-24 |
Tender Fee | |
EMD | 1.91 Lakh |
Tender Value | |
Place | O/o the E. E., PWD, Malda Division, Malda. |
Link | https://wbtenders.gov.in |
Start Date | July 22, 2023 16:30 |
End Date |
04/08/2023 ( Expired 649 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreWidening and strengthening of road from lunkaransar to baderan km 0/0 to 15/0
Widening and strengthening of road from lunkaransar to baderan km 0/0 to 15/0
Read moreWbpwd/pw(r)/sepd/piu-i/nit-08 of 2025-2026,sl-1
Widening and strengthening of ayeshbagh - harirampur road from 0.00 kmp to 17.20 km under murshidabad highway division no. i in the district of murshidabad under ridf xxx. (2nd call)
Read moreRepair and rehabilitation of 05 nos. bridges
Repair and rehabilitation of 05 nos. bridges of nh-512 under n.h. division no. vii, p.w. roads directorate in the district of dakshin dinajpur, west bengal during the year 2024-25 on sbd mode. job no. nh-512/wb/2024-25/565
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreAAAAAAAAAA
Login to viewConstruction of saucer drain from 30.00 kmp. to 30.550 km of manbazar-bandwan-kuilapal road under purulia highway division in the district of purulia.
Read moreMahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd
Mahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd, project id-pd252632621s000
Read moreConsultancy services for ae for construction of descoped portion of binnaguri bypass in binnaguri mouza of nh-27 (old nh-31d) from chainage 17.500 to 23.000 of old nh-31d in the district of jalpaiguri west bengal on epc mode under nh(o)
Consultancy services for ae for construction of descoped portion of binnaguri bypass in binnaguri mouza of nh-27 (old nh-31d) from chainage 17.500 to 23.000 of old nh-31d in the district of jalpaiguri west bengal on epc mode under nh(o)
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreof your Industry type