Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Turfing For O.B. Dump Near 10 No. Quarry Under Chapapur Colliery.
|
| Description |
Turfing For O.B. Dump Near 10 No. Quarry Under Chapapur Colliery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_285664_1 |
|
Reference Number |
ECL/GM/MA/CE/23-24/eTender/197 Dt. 09.08.2023 |
| Tender Fee | - |
| EMD | 17100 |
| Tender Value | - |
| Place | Office of The General Manager, Mugma Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 16, 2023 19:30 |
| End Date |
Expired
26/08/2023
Expired 1142 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and spreading of quarry dust at padma nagar for bathukamma festival in ward.no.14, gwmc. (general funds 2026-27)
Supply and spreading of quarry dust at padma nagar for bathukamma festival in ward.no.14, gwmc. (general funds 2026-27)
Read moreSupply and spreading of quarry dust at sundaraiah nagar for bathukamma festival in ward.no.14, gwmc. (general funds 2026-27) (reserved for sc individual/ societies)
Supply and spreading of quarry dust at sundaraiah nagar for bathukamma festival in ward.no.14, gwmc. (general funds 2026-27) (reserved for sc individual/ societies)
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreMaking of 03 (three) nos. of ventilation stopping in proposed panel-o in 7 and 8 incline of dhori (k) colliery ,dhori area.
Making of 03 (three) nos. of ventilation stopping in proposed panel-o in 7 and 8 incline of dhori (k) colliery ,dhori area.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreTurfing at o.b. dump of barmuri ocp under mugma area.
Turfing at o.b. dump of barmuri ocp under mugma area.
Read moreConstruction of toe wall around ob dump of chapapur-ii ocp under chapapur colliery, mugma area.
Construction of toe wall around ob dump of chapapur-ii ocp under chapapur colliery, mugma area.
Read moreMaking of boulder check dam at west o.b. dump of tirap colliery
Making of boulder check dam at west o.b. dump of tirap colliery
Read moreFencing around coal depot under 10 no quarry, chapapur colliery, mugma area.
Fencing around coal depot under 10 no quarry, chapapur colliery, mugma area.
Read moreof your Industry type