Tender Details
Particulars | Details |
---|---|
Title |
Excavation, Loading Of Pond Ash From Ash Dyke Of Sstpp Dongalia And Transportation And Unloading At Designated Places On The Const. Site Of Rehabilitation And Up Gradation Of Indore Ujjain Road (Sh 59) From 4lane To 6lane With Paved Shoulders ......
|
Description |
Excavation, Loading Of Pond Ash From Ash Dyke Of Sstpp Dongalia And Transportation And Unloading At Designated Places On The Const. Site Of Rehabilitation And Up Gradation Of Indore Ujjain Road (Sh 59) From 4lane To 6lane With Paved Shoulders ......
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2025_MPPGC_394467_1 |
Reference Number |
WT-2577 |
Tender Fee | 6180 |
EMD | 71.48 Lakh |
Tender Value | |
Place | SE PURCHASE AND WORK SSTPP DONGALIA |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=464363 |
Start Date | January 10, 2025 16:30 |
End Date |
31/01/2025 ( Expired 102 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read morePerformance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Performance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Read moreLoading of toyo/dredger output by engaging vt/ponmana forum members and transportation of mineral sand from vt/ponmana mining area and unloading near to spiral plant at vt mining site.
Loading of toyo/dredger output by engaging vt/ponmana forum members and transportation of mineral sand from vt/ponmana mining area and unloading near to spiral plant at vt mining site.
Read moreWork contract for excavation, removal and transportation of ash accumulated inside silos of ph-i at 2x600 mw, sstpp, mppgcl, dongalia.
Work contract for excavation, removal and transportation of ash accumulated inside silos of ph-i at 2x600 mw, sstpp, mppgcl, dongalia.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Read moreMechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump fod through nmdc weigh bridges in loading plant area
Mechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump (fod) through nmdc weigh bridges in loading plant area at an average lead distance of 1.80-
Read moreof your Industry type